1) flower-inducing method
成花措施
3) Measures of constructing wells
成井措施
4) successful measure
成功措施
1.
This paper analyzes the basic conditions and diathesises should be had by the international project contracter and detailedly discusses the operation stragedy and the successful measure to do complete engineering well.
分析了国际工程承包企业应具备的基本条件和素质 ;详细阐述了经营策略和搞好工程项目的成功措
6) fertilization application of cotton
棉花施肥措施
补充资料:不合格品纠正措施(见纠正措施)
不合格品纠正措施(见纠正措施)
corrective actions for nonconforming product:see corrective actions
bul,卯ping jiuzhe叫euoshi不合格品纠正措施(~tive actions for non-印雨皿吨prt泪uct)见纠正措施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条