1) its cause and measure
成因及措施
4) affecting factors and counter-measure
影响因素及措施
5) measures and experiences
措施及经验
1.
With analyses of stress correlation during terrene excavation and damaged pattern for the terrene excavation,it completely confirms the significance of interaction between support and wall rock,some measures and experiences to ground pressure change and roof plate management of pit are generalized in views of the interacted relation.
通过对巷道中开挖岩体前后的应力关系及岩体开挖的破坏模式分析,充分证实了支护与围岩相互作用关系的重要性,鉴于这种相互作用关系,简述一些在采场地压变化及顶板管理中所采取的一些措施及经验。
补充资料:不合格品纠正措施(见纠正措施)
不合格品纠正措施(见纠正措施)
corrective actions for nonconforming product:see corrective actions
bul,卯ping jiuzhe叫euoshi不合格品纠正措施(~tive actions for non-印雨皿吨prt泪uct)见纠正措施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条