1) computation period
计算期
1.
In order to provide methods and bases of scientific decision-making for scheme comparison of project feasibility study, it was analyzed that comparative method, comparative standard and economic assessment index in computation period of scheme comparison.
文章通过对项目方案比较中计算期不同的比较方法、标准的选用、经济评价指标的应用进行了具体的分析 ,为项目可行性提供了科学决策方法和依
3) computation of working time
工期计算
1.
In this article,according to many years pedagogic experience,the author summarizes the ways on computation of working time and drawing of gradation plan calendar multi-story running construction with different paces.
介绍了多个施工层异步距异节拍流水施工的工期计算及进度计划表的绘制方法。
5) calculated project duration
计算工期
1.
According to a bar chart and activity-on-arrow network in different building parts construction, the different calculated project durations between flow process plan and network plan are introduced and their differences are presented in essence.
分别用流水进度计划中横道图的方法与网络计划中双代号网络图的方法安排分段施工的进度计划 ,得出不同的计算工期 ,揭示出流水进度计划和网络计划安排进度计划的实质差异 ,然后提出流水网络计划使得流水进度计划与网络计划达到统
6) Installment calculation
分期计算
补充资料:成本计算期(costperiod)
产品成本计算所确定的特定期限。产品成本计算期的确定一般与企业所生产产品的特点有密切关系。例如,在大量大批生产的情况下,由于产品生产的不间断性以及品种的单一性,必然造成在每个月都有一部分产品完工,一部分产品正在生产中,为了能及时计算完工产品成本,并按期计算销售产品的盈利,就需要按月进行成本的计算。再比如,在单件小批生产的情况下,不论生产周期的长短,往往都是一批批产品全部一次投入,要求一次完工,整体对外出售,而且各批产品生产周期长短不一,为了能正确计算每一批产品的销售利润,只能等某一批产品完工后才能计算成本,这就使成本计算期具有不定期的性质,它与其生产周期一致的。
成本计算期的不同会对在产品计价产生直接的影响。在单件小批的生产的情况下,由于成本计算是不定期的,所以就不需要对在产品进行计价。整批产品在完工以前都在产品,一旦完工后,都作为产成品。而在大批大量生产条件下,由于成本计算期是按月进行的,所以就需要将生产费用按月在完工产品与在产品之间行合理的划分,以便正确计算完工产品成本与产品成本。
另外,有必要分清成本计算期与会计核算期的不同概念,不论成本计算是否定期,会计核算期总是按月进行的,也就是说,在任何情况下,各月发生的生产费用必须按月进行归集。
成本计算期的不同会对在产品计价产生直接的影响。在单件小批的生产的情况下,由于成本计算是不定期的,所以就不需要对在产品进行计价。整批产品在完工以前都在产品,一旦完工后,都作为产成品。而在大批大量生产条件下,由于成本计算期是按月进行的,所以就需要将生产费用按月在完工产品与在产品之间行合理的划分,以便正确计算完工产品成本与产品成本。
另外,有必要分清成本计算期与会计核算期的不同概念,不论成本计算是否定期,会计核算期总是按月进行的,也就是说,在任何情况下,各月发生的生产费用必须按月进行归集。