说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 计算工期
1.
The application of network analysis method in calculating of construction period claiming;
网络分析法在计算工期索赔中的应用
2.
error-free runing period
正常操作[工作]期,无误运转时期(计算机)
3.
They are based on an hourly,daily or weekly rate or on a certain amount of work done.wages
按小时、日、星期计算或按完成一定的工作量计算.
4.
They are based on an hourly, daily or weekly rate or on a certain amount of work done.
按小时、日、星期计算或按完成一定的工作量计算。
5.
Computer programming in calculation of large cavity surrounding rock by constructing stages;
大型洞室围岩计算中分期施工计算机程序处理
6.
Working Party on Programme Budget and the Medium-term Plan
方案预算和中期计划工作队
7.
Working Party on the Medium-term Plan and the Programme Budget
中期计划和方案预算工作队
8.
On the Computerization of Periodicals Management in the Library of Military Academy
谈军校图书馆期刊管理工作计算机化
9.
Time-cost Optimization and Its Ant Colony Algorithm in Network Plan;
网络计划工期费用优化及其蚁群算法
10.
Calculating Method of Fuzzy Construction Time of Lapping Network with Single Number;
单代号搭接网络模糊工期的计算方法
11.
Calculation of the Vertical Deformation of Mixed Structure During Construction
混合结构体系施工期间竖向变形计算
12.
On Claim Damages and Duration Calculation within The New Edition of Conditions of Contract for Construction;
新版《施工合同条件》中费用和工期索赔的计算
13.
Period of Construction Cost Optimization Model and Algorithm Design About Project Progress Adjustment;
工程进度调整的工期—费用优化模型及算法设计
14.
On construction technology in concrete winter period and relative thermal calculation
混凝土冬期施工技术及其相关热工计算与分析
15.
computing interva
计算周期, 计算时间间隔
16.
Over the same period, the average wage rate in the manufacturing sector fell by 0.6 per cent in money terms, but rose by 4.6 per cent in real terms.
同期,制造业的平均工资,以货币计算下降了0.6%,以实质计算则增加4.6%。
17.
Set up installation plan and budget and perform completion date.
制定安装计划和预算,按安装完工移交日期。
18.
For two weeks, we studied computer parts and how they worked.
我们花了两个星期学习计算机部件和工作原理。