说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 线形建设项目
1)  linear construction project
线形建设项目
2)  linear development and construction project
线形开发建设项目
1.
In order to monitor the loss amount of soil and water,the implement progress of soil and water conservation measures,quality and benefit of linear development and construction project scientifically and accurately,minimize the harm of soil and water loss in the process of production and construction.
为了科学准确地监测线形开发建设项目的水土流失量和水土保持措施实施进度、质量及效益等,将生产建设过程中的水土流失危害减至最小,以108国道(石门营-规划六环路)改建工程为例,对线形开发建设项目的水土保持监测分区、内容、方法以及结果等进行了探讨。
3)  linear construction
线型建设项目
1.
However, research has indicated that CPM is ineffective for linear construction.
研究表明,以CPM为代表的现行网络计划方法,并不适应于线型建设项目。
4)  construction project
建设项目
1.
The analytical model of safety cost rate for the construction project;
建设项目安全成本率分析模型
2.
Discussion on safety evaluation of power plant construction project;
火力发电建设项目安全评价问题探讨
5)  project construction
项目建设
1.
Contribution of science and technology extension in project construction and management;
科研推广在项目建设与管理中的作用
2.
On control of project cost in project construction process;
项目建设过程中工程造价的控制
3.
LCC management in paper machine project construction;
纸机项目建设中的LCC管理
6)  construction projects
建设项目
1.
Reliability past-evaluation to expressway construction projects;
高速公路建设项目可靠性后评估
2.
Research on Socioeconomic Environmental Impact Assessment of railway construction projects;
铁路建设项目社会经济环境影响评价研究进展
补充资料:报批建设项目用地


报批建设项目用地


【报批建设项目用地】在审批建设项目用地过程中,按征用土地审批权限规定,需报_L级人民政府进行审查批复的活动。土地管理部门报批建设项目用地,除用地单位正式申报建设用地时按土地审批权限抄报给上级土地管理部门有关附件外,还应向同级人民政府或t级土地管理部门加送以下附件:1.土地管理部门对建设用地的审查意见;2.建设用地征求意见书或有关部门证明材料;3.对建址在城市规划区内的项目,应附城市规划管理部门的审查意见;4.建设项征目拨用地呈报表;5.征〔拨)用地的补偿安置方案和征地费用包干协议,并附征地费用计算依据。需报国务院批准的建设用地,由省级人民政府行文上报。报告、文件按国务院规定份数报送;附件一式三份,其中报国务院一份,抄送国家土地管理局一份,建设项目的国家主管部门一份。建址在城市规划区内的项目,另抄送建设部一份。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条