1) linearization construction and exploitation projects
线型开发建设项目
1.
The linearization construction and exploitation projects mainly include the projects like the highway, railroad, dike, ditch, natural gas and oil pipeline etc.
以江西省长江干流江岸堤防加固整治工程水土保持监测为例,对线型开发建设项目的水土保持监测范围、内容、程序和方法以及需提交的成果等进行了探讨。
2) linear development and construction project
线形开发建设项目
1.
In order to monitor the loss amount of soil and water,the implement progress of soil and water conservation measures,quality and benefit of linear development and construction project scientifically and accurately,minimize the harm of soil and water loss in the process of production and construction.
为了科学准确地监测线形开发建设项目的水土流失量和水土保持措施实施进度、质量及效益等,将生产建设过程中的水土流失危害减至最小,以108国道(石门营-规划六环路)改建工程为例,对线形开发建设项目的水土保持监测分区、内容、方法以及结果等进行了探讨。
4) development project
开发建设项目
1.
It introduces the application of remote sensing technique to the working process and key steps of soil and water conservation monitoring of development projects by taking Hongjiadu Hydro-Power Station as an example.
以洪家渡水电站为例介绍了遥感技术在开发建设项目水土保持监测中应用的工作流程和关键步骤。
2.
Adopting the law of measure coefficient,soil and water loss amounts of plasticity geography during development project is calculated,the veracity of prediction of soil and water loss in the stage is increased greatly,the theoretic basis is offered for the working-out of soil and water conservation scheme of the construction project.
采用实测系数法,推算出开发建设项目施工期各类再塑地貌产生的水土流失量,大大提高了该阶段水土流失预测的准确性,为开发建设项目水土保持方案防治措施的制订,提供了可靠的理论依据。
5) development and construction projects
开发建设项目
1.
Advances on soil loss monitoring techniques for development and construction projects in China;
我国开发建设项目水土流失监测技术进展
2.
Arrangement of soil and water conservation monitoring points of development and construction projects
开发建设项目水土保持监测点布局
3.
Usually the surface would be hardened in a large area after completion of development and construction projects.
开发建设项目建成后往往使地表大面积硬化,从而改变项目区入渗、蒸发、地表径流量和特性。
6) development and construction project
开发建设项目
1.
Analysis of soil conservation monitoring method for Xinjiang development and construction projects
新疆开发建设项目水土保持监测方法浅析——以库玛拉克河吐木秀克水电站工程为例
2.
0×105 t/a bamboo-pulp paper production project in Chishui City, Guizhou Province, China for an example, soil and water conservation and ecological reconstruction of the development and construction project in the low mountain and hill region are discussed.
以位于贵州省赤水市的"黔北20万吨/年竹浆林纸一体化工程项目"为例,研究了低山丘陵区开发建设项目中的水土保持和生态建设问题。
3.
This paper discusses the demands for tasks and data of soil and water conservation monitoring in development and construction projects, puts forward an indicator system for soil and water loss monitoring, and designs an information system based on 3S techniques (remote sensing, geographic information system, and global positioning system).
在全面分析开发建设项目水土保持监测的业务和数据需求的基础上,提出了统一的监测指标体系,构建了基于3S技术的开发建设项目水土保持监测信息系统。
补充资料:报批建设项目用地
报批建设项目用地
【报批建设项目用地】在审批建设项目用地过程中,按征用土地审批权限规定,需报_L级人民政府进行审查批复的活动。土地管理部门报批建设项目用地,除用地单位正式申报建设用地时按土地审批权限抄报给上级土地管理部门有关附件外,还应向同级人民政府或t级土地管理部门加送以下附件:1.土地管理部门对建设用地的审查意见;2.建设用地征求意见书或有关部门证明材料;3.对建址在城市规划区内的项目,应附城市规划管理部门的审查意见;4.建设项征目拨用地呈报表;5.征〔拨)用地的补偿安置方案和征地费用包干协议,并附征地费用计算依据。需报国务院批准的建设用地,由省级人民政府行文上报。报告、文件按国务院规定份数报送;附件一式三份,其中报国务院一份,抄送国家土地管理局一份,建设项目的国家主管部门一份。建址在城市规划区内的项目,另抄送建设部一份。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条