1) Production of sweet osmanthus
桂花生产
2) laurel peanut crisp
桂花花生酥
4) Osmanthus fragrans secondary community
桂花次生林群落
1.
A series of techniques, including the analysis of variance, χ2-test and Ochiai s coefficient were used and calculated based upon a 2×2 contingency table to determine the overall association, the statistical significance, the coefficient of the each species-pair association and mixing of the 14 major species in Osmanthus fragrans secondary community in Changting County, Fujian, China.
根据2×2联列表,运用方差分析、χ2统计量度量、Ochiai指数系列技术,测定福建省长汀县桂花次生林群落14个主要树种间的总体联结关系、种对间联结显著性和关联系数,并首次引入混交度,阐述种间关联性与种间空间隔离程度之间的关系。
5) peanut production
花生生产
1.
This paper analyzed the different stages of peanut production and the increasing trend of the export quantity and amount of peanut in china, and make a suggestion to developing peanut production.
文章分析了我国花生生产经历的不同的发展阶段,花生出口量及出口金额的增长趋势,我国花生生产的主要省份及单产较高省份的花生生产,同时提出了我国今后发展花生生产的建议。
2.
This article deals with the basics of peanut production in Tieling and the advantages it enjoys,analyzes the significance of expanding this industry,points out the existing problems and consequently puts forward countermeasures.
但花生生产存在连作严重、品种单一等问题,制约了铁岭市花生产业的发展。
6) Dried longan production technology
桂元干生产工艺
补充资料:JIT准时制生产(及时制生产)
JIT准时制生产(及时制生产):是应用拉引式生产物流控制原理的方法。在生产系统中任何两个相邻工序即上下工序之间都是供需关系,如何处理这种关系,就是生产物流所要研究的问题。按照传统的生产计划组织生产(包括MRP),物料根据预定的计划时间由供方向需方逐个工序流动。需求方根据上一工序送来物料的数量和到达时间进一步加工。需求方接受物料完全是被动的,如果出现不可预料的因素,物料可能提前或延迟到达。延迟到达将使生产中断,必须在生产计划中留有余地,以避免这种现象的发生。这样一来,必然存在或多或少、提前到达的现象,从而导致系统中库存量的上升,产生种种库存多余的弊病。JIT的方法改变了传统的思路,由需方起主导作用,需方决定供应物料的品种、数量、到达时间和地点。供方只能按需方的指令(一般用看板)供应物料。送到的物料必须保证质量,无残次品。这种思想就是以需定供,可以大大提高工作效率与经济效益。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条