说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 变雨量站
1)  changing gauging stations
变雨量站
2)  rain-gauge station
雨量站
1.
With the application of the data from rain-gauge stations in the experimental region of rain-gauge network for plum rains at home,the density of rain-gauge stations is studied with multi-hydrologic model set in combination of both the method of station sampling and the hydrologic simulation on the p.
从水文多尺度仿真的角度研究雨量站网密度问题,构建了水文多尺度仿真模型族和水文多尺度仿真系统。
2.
Point interpolation algorithm is of important significance in analysis of rain-gauge station distribution,calculation of areal precipitation,and planning for rain-gauge net.
根据万有引力原理,任意雨量站雨量与待插值点雨量存在着万有引力。
3)  rainfall station
雨量站
1.
Optimization of rainfall station network in the river basin of Fengshuba Reservoir;
枫树坝水库坝址流域内雨量站站网优化
4)  precipitation station
雨量站网
1.
The application in precipitation station layout with cone gradient method;
锥体梯度法在雨量站网布设中的应用
2.
Determination of precipitation station is an important problem for the hydrological network design.
确定雨量站网密度是水文站网规划中的一个重要问题。
5)  rainfall network
雨量站网
1.
The reserch is evaluation of rainfall network,including control of rainfall stations,match of river distribution and rainfall network ,requiring of necessary rainfall stations both regional representative station and Xiaohe station, calculation raquiring of surface rainfall, necessary station requiring of regimen messages and flood report.
根据雨量站网评价结果,结合云南省的实际情况,从雨量站的高程控制情况、河流分布与雨量站网的匹配状况、区域代表站及小河站的配套雨量站需求、面雨量计算的需求、水情信息报汛配套站需求等方面,采用面平均相关法、经验公式法等分项评价方法,对现状雨量站网的密度和满足程度作客观评价,提出云南省雨量站网的设站目标为2690~3208站,为雨量站网规划和站点布设提供科学依据。
2.
It is proposed that maximum economic benefit is considered as the index for the optimization of rainfall networks.
分析了水文站网的经济效益,建立了雨量站网密度与其经济效益之间的定量关系。
6)  rainfall observation stations
雨量站点
1.
Through analyzing precipitation materials of fourteen rainfall observation stations in Foziling reservoir and weight calculation of rainfall observation stations with different combinations by Tayson Polygon Method,feasibility studies are made on rainfall stations.
依据佛子岭水库14个雨量站点降水资料进行系统分析,用泰森多边形法对水库流域雨量站按不同组合进行权重计算,对面雨量站点进行论证,提出优化调整的思路,确定一个经济合理、可行性强的预报站点组合。
补充资料:换流站逆变侧交流系统故障


换流站逆变侧交流系统故障
AC system faults on inverter side of converer station

  huanl一uZhonn{b一oneeJ一00!旧xltong guZhong换流站逆变侧交流系统故阵(AC systemfaults on inverter side of eonverter station)直流抽电受端交流系统发生的故障,包括三相短路、两相短路、两相对地短路、单相对地短路以及断线等.在常规的直流物电系统中,逆变器必须在受端交流系统提供的换相电压支持下才能正常工作。交流电网的故障会使逆变站交流母线电压的幅值、相位和波形发生变化,这些变化将可能引起逆变侧控制系统失去同步基准信号、阀触发系统储能不足,或逆变器的换相失败(见换流莽故降).逆变侧交流系统故障对直流系统的形响比整流侧的严重,其形响的程度往往以是否引发逆变器的换相失败或换相失败后是否能自行恢复正常来衡t。 三相对称故瘫,将由于故障地点的远近不同而使换相母线电压的下降程度不同,通常下降至额定电压的70%~60%时,逆变器就可能发生换相失败。由换相电流关系式可推导出三相交流电压下降造成逆变器发生换相失败的极限下降系数,即护万v[eos下。一eos(7。一y。。+600)〕式中。岛为换相电抗;几为直流运行电流,y。为关断角整定值;ym.二为极限关断角;U为故障前交流母线线电压有效值。如果采用低压限流(VDCL)的措施.通常在额定电压的40%时,还可维持直流系统运行。 交流系统不对称故障会使逆变站交流母线各相电压幅值和相位发生不同程度的变化。不对称故障除了降低换相电压外,还引起换相电压过零点的不对称移动,从而又直接影响到换流阀的关断角。通常不对称故障对关断角的影响比对称故障更严重。当逆变侧交流系统发生不对称故障时,逆变器往往会由于关断角变小而发生换相失败。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条