说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 山羊生产
1)  Goat Raising
山羊生产
1.
Application of Storied Goatfold in Goat Raising;
楼式羊舍在山羊生产中的应用
2.
Good economic benefit could be gained from developing goat raising vigourously by utilizing plentiful natural grassland in rocky mountain in Heci as well as establishing service network of production and marketing.
河池地区利用石山、半石山丰富的草地资源,大力发展山羊生产,建立产、销服务网络,经济效益特好。
2)  goat production
绒山羊生产
1.
This Paper studied the plan objective and principle of the optimal goat production pattern in the shrubby and semi-shrubby sandy grassland on the Ordos Plateau, and built a conceptual model of the pattern, and posed the core idea of its design.
本文探讨了鄂尔多斯高原沙质灌木、半灌木草地绒山羊生产模式的设计目标和原理,建立了优化生产模式的概念模型,并确定其设计的基本核心思想。
3)  sheep and goat production
绵、山羊生产
1.
Developing sheep and goat production is the stress point in modulation of animal husbandry productive structure and one of the major directions in livestock raising model of economized foodstuff,which has an enormous potential.
发展绵、山羊生产是畜牧业生产结构调整的重点环节,是节粮型畜牧业发展的主要方向之一,有很大的发展潜力。
4)  To give birth to; bear. Used of sheep and goats.
生小羊生;产。用于绵羊和山羊
5)  Abortion goat
流产山羊
6)  Doe abortion
山羊流产
补充资料:JIT准时制生产(及时制生产)

JIT准时制生产(及时制生产):是应用拉引式生产物流控制原理的方法。在生产系统中任何两个相邻工序即上下工序之间都是供需关系,如何处理这种关系,就是生产物流所要研究的问题。按照传统的生产计划组织生产(包括MRP),物料根据预定的计划时间由供方向需方逐个工序流动。需求方根据上一工序送来物料的数量和到达时间进一步加工。需求方接受物料完全是被动的,如果出现不可预料的因素,物料可能提前或延迟到达。延迟到达将使生产中断,必须在生产计划中留有余地,以避免这种现象的发生。这样一来,必然存在或多或少、提前到达的现象,从而导致系统中库存量的上升,产生种种库存多余的弊病。JIT的方法改变了传统的思路,由需方起主导作用,需方决定供应物料的品种、数量、到达时间和地点。供方只能按需方的指令(一般用看板)供应物料。送到的物料必须保证质量,无残次品。这种思想就是以需定供,可以大大提高工作效率与经济效益。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条