1) the amount of collecting scion
采条量
2) strip pillar mining
条带开采
1.
Prediction and evaluation on building damages of strip pillar mining under villages;
村庄下条带开采对地表建筑的影响预测及评价
2.
Determination of surface subsidence prediction parameters for strip pillar mining
条带开采地表沉陷预计参数的确定
3.
Based on the specific geological and mining conditions and the status of Nanying buildings,the results show that it is feasible and reasonable to extract the coal reserves under village using strip pillar mining method in this coal mine,and the strip pillar mining plans and their parameters were presented.
根据铁生沟煤矿地质采矿条件及南营村建筑物现状,对开采技术进行了分析,南营村建筑物下压煤采用条带法开采在技术上可行、经济上合理,并给出了条带开采方案及其参数。
3) strip-partial mining
条带开采
1.
Research on surface movement parameters of strip-partial mining;
条带开采地表移动参数研究
2.
Coal pillar stability of deep and high seam strip-partial mining;
深部厚煤层条带开采煤柱的稳定性
3.
Whether the strip coal pillar is stable or not is one of the key problems of strip-partial mining.
条带开采煤柱的稳定与否是条带开采成败的关键。
4) mining condition
开采条件
1.
Through analysing the geologic condition and deposit formation,scientific and reasonable selection first mining section in the process of second phase enlarging constructing design and achieving mining fill equilibrium in the process of mine production are put forward on the basis of the mining condition of Zhangmatun Iron Mine.
文章分析了张马屯铁矿的水文地质条件和矿体形态,根据矿床开采条件提出了二期扩建工程设计中应科学合理地选择首采地段,并努力实现矿山生产的采充平
2.
The mining condition in underground mine is an important factor to design and produce.
矿井开采条件是影响煤矿设计和生产的重要因素,它是一个由多个子因素组成的综合指标。
3.
Based on the variable fuzzy collection theory,a new safety evaluation model of the mining conditions in the mine,a fuzzy identification model,was established.
以可变模糊集理论为基础,建立一种新的煤矿开采条件安全评价模型——模糊可辨识模型,详细论述了模型建模过程。
5) Recovery condition
采收条件
6) strip mining
条带开采
1.
Dimension design of coal pillar with weak plane in strip mining;
条带开采中含弱面的煤柱尺寸设计
2.
Deformation features of a roadway affected by strip mining;
条带开采中巷道的变形规律
3.
Numerical simulation of overlying strata and ground movement value induced by strip mining below thin bedrocks;
薄基岩条带开采覆岩与地表移动数值模拟研究
补充资料:采剥量验收测量
采剥量验收测量
acceptance surveying of excavated volume
eo一bol一ang yanshou eel一ong采剥t验收测t(aeeeptanee surveying。f ex-Cavated volume)定期测量并计算采剥矿岩体积的工作。一般每月测量一次作业台阶的采剥进度线,内容包括测量台阶平台上的结存矿和岩堆,绘制台阶采剥验收平面图,并据此计算采剥矿岩体积。一些国家在露天矿山采用地面立体摄影和航空摄影测量,中国的一些露天矿也研究用地面立体摄影测量作采剥量验收方法。 测量方法要根据露天矿具体条件和采用的工作控制网来选择,一般有经纬仪视距测记法、交会法和摄影测量法等。中国大多数露天矿都使用经纬仪视距测记法,这种方法与其他两种方法相比,其优点是携带的仪器少、外业时间短.适用于任何形状采区、任何开采深度和任何工作控制网。视距测量使用的仪器,其精度应不低于.JI:级。测量时,直接在工作控制点安置仪器,按极坐标法测定坡顶、坡底线上的特征点。特殊情况下可由工作控制点引出一个视距导线支点,边长应不超过80m。采用断面线法布设工作控制网时,采剥量验收用两台经纬仪交会(见图):一台经纬仪安置在CC‘断面线一端的基点c上,标定断面线方向并测量断面线上坡顶点、坡底点及其余特征点的竖直角占,;另一台经纬仪安置在间隔2一3条断面线的基点F上,测量基线BF与各特征点间的水平角月,,分别按下式计算各特征点距基点C的水平距离d、一ltan夕.和对c点的高差h一ditan占,式中l为安置经纬仪的两基点间的水平距,m。 采剥量体积计算方法有垂直断面法和水平截面法两种。 (1)垂直断面法在采剥验收断面图(或由采剥验收平面图,按规定间隔的断面线位置转绘的断面图)上,量出各断面月初与月末进度所圈定的图形面积S,,则两断面间的体积 5.+S_,. V,~一乙 2落 断面线法当S、与S+1面积相差40%以上时 v一音(S+S】一+丫5 15,一,式中1.为相邻两断面间距离,m。 (2)水平截面法在采剥验收平面图上,分别量出月初、月末坡顶线和坡底线所圈定的图形面积S上和S下,则两水平截面间的体积 S卜+S下. V一二只三二-二二上h 2式中h为台阶平均高,m。 采剥矿岩量等于体积乘以相应的容重。月采剥矿岩量则需加上本月验收后到月末的统计量,减去上月验收后到上月末的统计量。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条