1.
~(3D)Numerical Simulation Research on the Confirmation of Rational Mining and Pillar Width in Strip Mining
条带开采合理采留宽确定的FLAC~(3D)数值模拟研究
2.
Research on Strip Mining under Buildings of Donghuantuo Coal Mine South 1st District;
东欢坨矿南一采区建筑物压煤条带开采研究
3.
Numerical Study on Substitution Extraction in Coal Pillar of Strip Mining
条带开采留设煤柱置换开采方法的数值模拟研究
4.
Research on the Rule of Surface Movement and Deformation Caused by Strip Mining in Steep Seam;
急倾斜煤层条带开采地表移动与变形规律研究
5.
Numerical Simulation of the Strip Mining under Shen-Da Super-way;
沈大高速公路下压煤条带开采的数值模拟
6.
Research on Parameter of Trip Mining under the Thickness Collapsible Loss;
巨厚湿陷性黄土覆盖层下条带开采参数研究
7.
Fundamental Research on Localization Hazard Monitoring Due to Three-underground Trip Mining
“三下”条带开采局部化灾害监测基础研究
8.
Evaluation method for pillar stability during strip mining in multiple coal seams
多煤层条带开采煤柱稳定性评价方法研究
9.
Surface Movement Laws of Deep Wide Strip-Pillar Mining Under Thick Alluvium
巨厚松散层下深部宽条带开采地表移动规律
10.
Study on the Surface Movement Law in Strip Mining of Inclined Multiple Coal Seams
倾斜多煤层条带开采地表移动规律研究
11.
Numerical Simulation and Calculation on Plastic Zone Width of Coal Pillar for Strip Mining
条带开采煤柱塑性区宽度的数值模拟与计算
12.
Predicted Research of Surface Movement in Deep Strip Mining
深部条带开采地表移动预计研究的探讨
13.
Study on ground movement and deformation of deep partial extraction along the dip in deepth
深部倾向条带开采地表移动变形规律研究
14.
The Relationship between Water Conducted Zone Height in the Moderate Hardness Cover Rocks and the Dimensions of the Strip Longwall;
中硬覆岩导水裂缝带发育高度与条带开采尺寸的关系研究
15.
Study on the Coal Pillar Stability of Deep and High Seam Strip-Partial Mining and Its Impact on the Village in Gucheng Coal Mine;
古城煤矿深部厚煤层条带开采煤柱稳定性及对村庄的影响研究
16.
Study on Mechanism of the Grouting Backfill in Caving Area with Strip Mining under Buildings;
建筑物下条带开采冒落区注浆充填减沉技术的理论研究
17.
Behavior Law of Mine Pressure in Roadways Under Conditions of Mining With Coal Pillars
带煤柱开采条件下巷道矿压显现规律
18.
Analysis on geological condition of coal seam mining with presser in ZhangCun Mine
章村矿下组煤带压开采地质条件分析