1) single measure
单项措施
2) the detailed measure program
措施项目清单
1.
With the Code of Valuation with Bill Quantity of Construction Works as the guide,the paper first overly analyzes the content of the detailed measure program,the establishment of criterion,the valuation principle and the valuation method,and then suggests some quote skills for the cost of measure program.
工程量清单计价是当前国际上普遍采用的工程计价形式,本文结合《建设工程工程量清单计价规范》的实施,对措施项目清单的内容、编制依据、报价原则以及计价进行了总体分析,提出了措施项目费的报价方法。
4) measure program
措施项目
1.
With the Code of Valuation with Bill Quantity of Construction Works as the guide,the paper first overly analyzes the content of the detailed measure program,the establishment of criterion,the valuation principle and the valuation method,and then suggests some quote skills for the cost of measure program.
工程量清单计价是当前国际上普遍采用的工程计价形式,本文结合《建设工程工程量清单计价规范》的实施,对措施项目清单的内容、编制依据、报价原则以及计价进行了总体分析,提出了措施项目费的报价方法。
6) unilateral measures
单边措施
1.
Since there is no sound system of international law restricting the country\'s unilateral measures,many countries,including China suffered.
由于目前国际法尚无健全的制度制约主权国家恣意横行的单边措施,使众多国家包括我国深受其害。
补充资料:不合格品纠正措施(见纠正措施)
不合格品纠正措施(见纠正措施)
corrective actions for nonconforming product:see corrective actions
bul,卯ping jiuzhe叫euoshi不合格品纠正措施(~tive actions for non-印雨皿吨prt泪uct)见纠正措施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条