1) immediate blocking and proceeding
立堵进占
2) end-dump
立堵
1.
Research on space and time effect of end-dump river closure with double dikes;
底孔分流条件下双戗堤立堵截流水力计算
3) occupied progressively
进占
1.
The rock-fill structure with soil engineering grills occupied progressively is to use rock filling with soil engineering grills and soils filled with geo-textile sacks instead of traditional body occupied progressively with willow stone.
土工格栅堆石进占筑坝是利用土工格栅堆石与土工布袋装土代替传统的柳石进占体。
4) end-dump advancing from both banks
双戗立堵
1.
The closure work of diversion channel of TGP is completed by means of end-dump advancing from both banks, it requires that the upstream closure dike should share two third of closure drop, and the downstream closure dike one third of closure drop.
三峡工程导流明渠采用双戗立堵截流 ,上下游戗堤分别承担 2 /3和 1/3落差 ,采用水力学计算确定相应落差分担关系下的进占协调关系和上下戗堤的龙口水力学参数 ,并对实际截流施工时的水力条件进行了反演计算。
5) river closure by end dumping
立堵截流
1.
Several basic problems in the investigation on risk of river closure by end dumping,are analyzed.
分析了立堵截流风险研究中所涉及的几个基本问题,并具体提出了截流工程中高流速、小水深这一类型的风险指标、风险率模型以及解决其计算关键问题的方法。
6) vertical horizontal closure
平立堵