说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 进占堤头
1)  head of the filling dike
进占堤头
1.
Off-stability conditions at head of the filling dike are put forward according to factors which may lead to slump of the head dike and applications of the above-mentioned conditions are also introduced.
三峡工程大江截流的主要特点是水深大、流量大截流过程中的关键技术难题是由截流戗堤坍塌所引起的安全问题从截流戗堤堤头坍塌的主要引发因素入手,提出了进占堤头失稳的条件,并对这些条件的运用进行了叙述
2)  dike advancement
上下戗堤进占
3)  one-direction end-dump advancing with narrow dike
窄戗堤单戗单向进占
4)  bank-head [英]['bæŋk,hed]  [美]['bæŋk,hɛd]
堤头
1.
To determine the bank-head s ice force of the lead-navigating bank at key position that faces the ice directly of certain water conservancy, ice model test in reduced scale is designed and carried out based on the local situation on the spot and data observed.
以现场实际工况及观测数据为依据,以确定某水利枢纽关键迎冰部位引航导堤堤头冰荷载问题为目的, 设计并进行了缩尺的冰模拟试验。
5)  occupied progressively
进占
1.
The rock-fill structure with soil engineering grills occupied progressively is to use rock filling with soil engineering grills and soils filled with geo-textile sacks instead of traditional body occupied progressively with willow stone.
土工格栅堆石进占筑坝是利用土工格栅堆石与土工布袋装土代替传统的柳石进占体。
6)  head of breakwater
防波堤堤头
补充资料:进占
进兵占领:~边关。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条