1) equilibrium ice jam
初始平衡冰塞
2) initial ice jam
初始冰塞
1.
Based on solid-liquid two-phase flow theory,this paper studies the movement locus of ice frazil and the advance of the edge of initial ice jam.
基于固液两相流理论,尝试研究水内冰冰花颗粒的运动轨迹和初始冰塞头部的推进过程,冰粒浮速的模拟计算结果与现有经验公式计算结果定性一致,冰粒运动轨迹和初始冰塞头部的推进过程与实验室中观察现象类似。
3) initial equilibrium
初始平衡
1.
According to the nonlinear theory elastically, and in terms of the equilibrium of single cable, a nonlinear analytical method of initial equilibrium and static response for the two\|span continuous cables sliding on the middle supporting was presented in this paper.
基于非线性弹性理论,从单索的平衡出发,在索元的无应力长度已知情况下,提出了两跨连续索在中间节点滑移的初始平衡位置确定及均布荷载作用下的静力响应分析方法,建立了其非线性计算的基本理论、公式和求解方法,并进行了实例计算。
2.
Finite element models were established using link and beam elements,respectively,to accurately and quickly calculate the dropper lengths,static stiffness,natural frequencies and mode shapes of catenaries in the initial equilibrium state.
为准确和快速地计算接触网初始平衡状态的吊弦长度、静态刚度、固有频率和模态振型,分别用索单元和梁单元建立了接触网有限元模型。
3.
Based on the obtained vertical displacement,the negative sag was reserved in advance to ensure the horizon of contact wire under the initial equilibrium state after a series of the calculations of negative sags.
基于整体求解的思想,通过接触网在张力和自重作用下的垂向位移,对接触网模型进行重构,并给接触线预留一定的负弛度,以保证经过几次负弛度计算后,接触线到达初始平衡位置时保持水平,由此得到满足初始平衡条件的吊弦长度,确定了接触网在初始平衡位置的几何参数和应力分布,同时将负弛度法和传统方法进行对比研究。
4) Balance ice jam
平衡冰塞
1.
A study on the relations about balance ice jam thickness with its flow conditions and ice discharge;
平衡冰塞厚度与水流条件和冰流量关系的试验研究
5) initial ice jam thickness
初始冰塞厚度
1.
A study on the relationship about initial ice jam thickness with its stream conditions and ice discharge;
初始冰塞厚度与水流条件及冰流量关系的试验研究
6) initial equilibrium state
初始平衡态
1.
The proposed approach proves to be feasible for determination of the initial equilibrium state and the loading state of cable-net structures.
从索网结构的节点平衡方程出发,推导了索网节点位移与索元内力增量所必须满足的平衡方程与变形协调方程的增量形式,然后用迭代法求解上述非线性方程组,从而对预应力索网结构进行初始平衡态以及荷载态下的节点位移和索力计算。
补充资料:冰塞
冰塞
ice jam
匕一r lgsC】l冰塞(i co Jam)河流封冻初期.在冰盖卜因大量冰花冰块堵塞部分过水而积.造成!_游水位雍高的现象。示意如图。 冰塞的形成需具备条件为:}有足够的来冰址.是形成冰塞的必要条件上游必须是未封冻的河段.水流才能与寒冷的大气进行热交换.产生大址冰花及冰块、②河道地形条件冰塞一般发生在水流不畅,比降突然变缓的河段,如急弯及狭窄的河段或水库回水末端、封冻冰盖前缘处的流速需大到某临界仇,流冰及冰花才能潜人冰盖以下。i亥临界流速常用弗劳德(Fr。》[lt{)数判别 F二一v/丫万万式中Fr为弗劳德数;V为冰盖前缘的平均流速;g为重力加速度;H为平均水深。根据黄河盐锅峡水库回水末端产生冰塞的实测资料分析,F,)0.的时,冰花潜人冰盖下形成冰塞;当Fr<0.09时,冰花难于下潜,而在冰盖前缘平铺,使冰盖向上游发展。尾部.尾部过渡段艳定段头部 1660任1650娜健 1640 1630 1620 1610 1600头部过波段\面位冰水一一一冰花夕,,I厅刀河流孔家寺下川牛鼻子峡进口大川10上中庄l﹂二里半古城清大庄小川洗河口上周罗家何家里 冰塞体部位 中国黄河上游刘家峡河段,于1961年冬盐锅峡水库建成蓄水后,至1967年刘家峡水库建成前,连续5个冰期发生严重的冰塞塑水现象。冰塞塑水位较冬季平均水位高9 m.冰花最大堆积厚10余m,造成刘家峡大坝基坑及主要公路被淹。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条