2) displacement monitoring
位移监控
1.
Using the displacement monitoring information,the soil body principle of balance,the support design principle of wall-protection pile instructs the difficult problem of the support and protections of deep hole excavated for building foundation is adapted to the enlargement of foundation depth.
运用位移监控信息、土体平衡原理、护壁桩支撑设计原理指导深基坑支护适应基坑深度变大的难题,具有施工方便、经济、安全的、工期短等特点,为在闹市区深基坑支护施工提供了经验。
2.
In view of the work of under ground-cut tunnel beneath railway bridge the underpinning construction method of its pile foundations under dynamic loads is introduced as well as lifting transition technique and displacement monitoring method, which provide good references for pile foundation underpinning and bearing capacity transition under complex geological condition.
暗挖隧道穿越铁路桥梁,在动荷载作用下进行桩基托换的施工方法、顶升转换工艺及桥梁结构的位移监控,为在复杂环境和地质条件下,进行桩基托换和承载力的转换积累经验。
3) monitoring index
监控指标
1.
Study on the safety-monitoring index for high arch dams based on Monte-Carlo;
基于蒙特卡罗方法的高拱坝变形监控指标拟定
2.
We put forward theoretical model,monitoring index and implementation means for safety monitoring of the high dam flood discharge protection structure,establish the comprehensive real-time evaluation and control system for safety risk based on summarizing key factors and dynamic mechanism of energy dissipation of flood discharge in dam.
在总结了高坝泄洪消能防护结构破坏的关键因素、动态作用机理基础上,提出了高坝泄洪防护结构安全监控的理论模型、监控指标和实现的手段,建立了高坝泄洪安全的风险实时综合评价和控制体系。
3.
According to failure characteristics and demand of dam working condition,a new method of making safety monitoring index is propounded which is applicable to the overflow dam section of Feilai Gorge Project.
结合大坝的破坏特点和工作条件要求,提出一种适于确定飞来峡水利枢纽9号溢流坝段安全监控指标的新方法,即根据强度储备法研究得到的坝体坝基的局部屈服、临界屈服、失稳破坏的发展阶段及对应的应力位移条件,进行统计回归分析得到与上下游水位相关的大坝安全、警戒、极限状态判断的监控指标,为枢纽的安全运行提供了科学的参考依据。
4) monitoring indices
监控指标
1.
Based on kernel ICA (KICA) model,the main contributions are as follows: firstly,a method to sort the rows of demixing matrix was introduced and the number of independent components was determined; secondly,the monitoring indices were extended into high-dimensional space by "kernel trick",and so a nonlinear process monitoring method was proposed.
在利用核ICA(KICA)建立过程非线性模型的基础上,根据核技巧,给出了一种高维空间分离矩阵的排序和独立元个数的选择方法,并将监控指标扩展到高维空间,从而提出一种基于KICA的非线性过程监控方法,解决了ICA对非线性过程监控效果不理想的缺点。
2.
However,as structural analysis has considered mechanical behaviors of the dam and its foundation and combined experimental and design information,it is more effective for the development of monitoring indices and can verify that the dam design is reasonable.
结构分析考虑了坝体和坝基的力学性态,并结合了实测和设计资料,用以拟定监控指标较为有效,并可以验证大坝设计的合理性。
3.
In order to evaluate the operational condition of the process,the paper constructs several statistics as the monitoring indices to measure the features and errors,respectively.
另一方面,将DFA引入过程监控中,构建统计量作为监控指标,分别衡量变量的特征信息和误差信息,从而实现对动态过程运行状况的监控与评估。
补充资料:我国商业银行资产负债比例管理监控指标
我国商业银行资产负债比例管理监控指标
【我国商业银行资产负债比例管理监控指标】 1.资本充足率指标。我国规定资本总额与加权风险资产总额的比例不得低于8%,其中核心资本不得低于4%,附属资本不得超过核心资本的100%。该指标是参照《巴塞尔协议》的标准确定的。其计算公式为:资本总额月末平均余额x 100%)8%核心资本月末平均余额x 100%〕4%、.了、、.J少,.盆门‘2.、,了厅、 关于资本成份和资产风险权数,中国人民银行总行作了具体规定,其主要内容是:(l)资本成份分为核心资本和附属资本两部分,其中:核心资本由实收资本、资本公积、盈余公积和未分配利润四部分组成;附属资本只包括贷款呆帐准备。(2)对资本总额中的扣除内容作了规定。(3)资产风险权数参考国际惯例划分为0%、10%、20%、50%、100%五个等级。表内资产和风险权数从我国实际出发,分六大类作了具体的规定。对表外资产项目的风险没有作出规定。 2.存贷款比例指标。我国要求各项贷款与各项存款之比不超过75%。 (l)对实行余额考核的商业银行,其计算公式为:各项贷款旬末平均余额x 100%落75% (2)对实行增量考核的商业银行,其计算公式为:各项贷款旬末平均余额x 100%成75% 3.中长期贷款比例指标。规定1年期以上(含1年期)的中长期贷款与1年期以上的存款之比不得超过120%。其计算公式为:余期1年以上(含1年期)中长期贷款月末平均余额余期1年以上(含1年期)xl的%落120% 同一借款客户指任何一个自然人或法人。 (2)对最大ro家客户发放的贷款总额不得超过银行资本总额的50%、;其计算公式为: 存款月末平均余额 “余期”指报告期与存款(贷款)到期日之间的时间。 在我国银行贷款中,中长期贷款所占比重比较大。由于中长期贷款主要是固定资产贷款,为了防止盲目扩大固定资产投资,保证信贷资产的安全性和流动性,所以规定了这项指标。 4.资产流动性比例指标。规定流动性资产与各项流动性负债的比例不得低于25%,其计算公式为:对最大10家客户发放的贷款总额 各项资本总额x 100%鉴50% 该指标是为了防范贷款风险过于集中而设置的,目的是分散风险,提高贷款安全系数。 7.拆借资金比例指标。在该指标中规定了拆人资金和拆出资金两个比例、, (l)拆人资金比例指标。拆人资金余额与各项存款余额之比不得超过4%。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条