您的位置:首页 -> 词典 -> 碧口水电厂
1)  Bikou hydropower plant
碧口水电厂
2)  datang bikou hydropower plant
大唐碧口水力发电厂
1.
Because the sluice supervisory and control system of datang bikou hydropower plant has had shortcoming of the weak real-time performance,in this paper a scheme of automatic sluice control system is presented.
针对大唐碧口水力发电厂远程闸门监控系统网络容易中断、实时性差的缺点,设计了一种闸门自动控制系统。
3)  Bikou Hydropower Station
碧口水电站
1.
This system has been successfully applied in Bikou Hydropower Station.
5组态软件设计并开发的水工闸门监控系统,具有强大的监视,控制和管理功能,能够实时显示闸门控制过程中的各种数据,并成功应用于碧口水电站。
2.
Because the sluice supervisory and control system of Datang Bikou Hydropower Station has had the shortcoming of the weak real-time performance, a scheme of automatic sluice control system is presented.
针对大唐碧口水电站闸门监控系统已不能达到实时监控目的情况,提出了闸门自动控制系统组网方案,设计了PLC闸门现地控制单元,利用PLC中CPU模块所带的内置以太网卡实现了PLC和上位机的通信,并使用iFIX组态软件编制了上位机控制界面,实现了以PLC与组态软件构成的监控系统对碧口水电站4扇闸门的自动控制。
4)  Shuikou power plant
水口电厂
5)  shuikou water power plant
水口水电厂
6)  Bikou reservoir
碧口水库
1.
Modification of water regime system at Bikou reservoir
碧口水库水情测报系统改造
补充资料:碧口水电站
      中国白龙江上以发电为主的大型综合利用水利枢纽。位于甘肃南部,坝址为凝灰岩及千枚岩,控制流域面积2.6万km2,电站装机30万kW,库容5.2亿m3,兼有防洪、灌溉、养殖、航运及过木等综合效益。枢纽中除拦河土石坝外尚有溢洪道、左、右岸泄洪洞、排沙洞等泄水建筑物和引水隧洞、调压井、压力水管、厂房等水电站建筑物以及放木道等建筑物。
  
  土石坝高101.8m,坝顶长297.4m,于1975年建成。坝体由多种土石料组成,并用部分开挖的石碴填筑。防渗体为土料心墙。为获得较好的压实效果,坝体施工中使用了振动平碾碾压堆石和砂砾石。在中国的水利工程中是首次使用这种施工技术。此外,该工程采用两道混凝土防渗墙处理深达34m的覆盖层。其中一道为钢筋混凝土墙,深达68.5m,为中国之冠。泄水建筑物采用表孔、中孔、底孔相组合,运行方便。其右岸泄洪洞系由导流隧洞提高进口改建而成,常称这种形式为龙抬头。这种既便于枢纽布置又节省投资的泄洪建筑物,由于选型适宜,建成十余年运行效果良好。内径为10.5m的水电站引水隧洞,为当时中国已建成的最大直径的压力隧洞。其末端分为内径6m的三条支洞,最大开挖宽度达25m以上。断面为长方形的阻抗式调压井,位于三条支洞上,开挖尺寸达12m×46.7m×79.25m(宽×长×高)。这样大型的矩形调压井在绢英千枚岩软弱地层中亦属少见。三台机组快速闸门与调压共用一井的尝试也获成功。该站为解决过木与发电用水的矛盾,在水利工程中首次采用了纵向链式原木传送机。这种过木机不改变原河道单根散漂原木的流放工艺,能适应高土石坝枢纽,布置在右侧坝面上。其上游部分为分节沉浮式,以适应上游水位较大的变幅;下游部分为固定式,后接短滑道,使木材脱机后经滑道入水,避免了过木机尾轮水下检修的困难。
  
  碧口水电站于1969年开工,1976年开始发电,1977年竣工,成为联接中国西南、西北大电网的纽带。
  