说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 水口电厂
1.
Data gathering used in the electric energy measuring management system at shuikou power plant;
水口电厂电能计量管理系统中的数据采集
2.
Study on Hydraulic Characteristic of Mushroom Shape Intake Flow;
火(核)电厂蘑菇头式取水口水力特性研究
3.
Research on Hydraulic Transient Characteristics from Water Intake to Pump Chamber Transition Forebay in Power Station;
电厂取水口至泵房过渡前池水力瞬变特性研究
4.
The Energy Dissipation Design of Circulating Water Outfall of High-head Drop at Thermal Power Plant
火电厂高落差循环水排水口的消能设计
5.
Technical renewing of hydroturbines of Danjiangkou Hydropower Plant owing to raising of dam
丹江口电厂水头大幅度提高后水轮机的更新
6.
Cement grouting in the Huanghua power plant project of drainage inlets
水泥注浆法在黄骅发电厂排水口工程中的应用
7.
Underground Powerhouse Design and Wall Rock Stability Analysis of Jiangkou Power Station;
江口水电站地下厂房设计及围岩稳定分析研究
8.
Economic Research on Investment and Operation of the Small Power Station of the Danjiangkou Project;
丹江口水利枢纽小电厂投资与运行经济研究
9.
Vanes Repair-Type in No.4 Hydroturbine of the Danjiangkou Hydropower Plant
丹江口水力发电厂4号机组固定导叶修型
10.
The Principle of Choosing Tunnel Gate Location for Nuclear Power Plants on the Coastal Sites in China
中国滨海核电厂取水明渠口门布置原则
11.
Scheme of Seepage Control of Underground Powerhouse of Lianghekou Hydropower Station
两河口水电站地下厂房渗流控制布置方案研究
12.
Craftwork for Installation of 3000t coffer of intake water of Xiamen gas-fired power plant
厦门燃气电厂取水口工程3000T沉箱安装工艺
13.
Study of Current Characteristic and Sediment Deposition Test in Water Intake of Thermal/nuclear Power Plant in Tidal Area;
潮汐水域火/核电厂取水口水流特性及泥沙淤积试验研究
14.
Application of Load Rejection Method to Measuring Electromagnetism Parameters on No.5 Generator of the Danjiangkou Hydropower Plant
采用抛载法测量丹江口电厂5号水轮发电机电磁参数
15.
hydroelectric(power) statio
水(力发)电厂[站]
16.
Study on How Sediment Deposition of Xinjin Reservoir on the Yujiang River Affects Water Intake of Nanning Power Plant
郁江西津水库泥沙淤积对南宁电厂取水口的影响研究
17.
Analysis on the Salt Water Intrusion and Its Influence on the Position of the Water Intake of the Power Plant
盐水入侵现象及其对电厂取水口位置的影响分析
18.
Hanjiang Light Pearl to re-create glorious time--A review of 40 years operation of Danjiangkou Hydropower Plant;
汉江明珠再铸辉煌——丹江口水力发电厂发电40年回顾