1) spillway system
溢流坝系统
2) overflow system
溢流系统
1.
The designs of the casting system,overflow system,cooling system and ejection mechanism of the die were stated in detail.
分析了铝合金轮毂的结构特点 ,介绍了铝合金轮毂压铸模的结构 ,并详细说明了模具浇注系统、溢流系统、冷却系统、推出机构的设
2.
The paper illustrates this point in many aspects, including constant speed filtration control, V conduct water flush hole position, air system design, overflow system setting and artistic, human oriented design thoughts.
与国内通常的设计思路相比,法国得利满和OTV两大公司在均质滤料滤池的设计中有许多方面值得借鉴,笔者结合国内的设计方法,详述了法国公司在恒速过滤的控制、V形槽布水孔的位置、气路系统的设计、溢流系统的设置以及美观和人性化设计等方面的设计特点,为国内设计人员提供参考。
3) overflowing system
溢流系统
1.
An introduction was made on the structure of the die casting die for the rear wheel hub of the motocycle and on the design of the pouring system,overflowing system,cooling system and demoulding mechanism.
分析了摩托车后轮毂的结构特点 ,介绍了摩托车后轮毂压铸模的结构 ,并详细说明了模具浇注系统、溢流系统、冷却系统、推出机构的设计。
2.
An introduction was made on the structure of the die_casting die for the cylinder body of the small gasoline motor and on the design of the inner gate, overflowing system and cooling system.
介绍了小型汽油机缸体压铸模的结构及内浇口、溢流系统、冷却系统的设
3.
In order to observe fluid field and temperature field of molten metal filling and solidifying process, the different pouring systems and overflowing system were designed to simulate die-casting process with numerical simulation method.
运用数值模拟的方法,对设计的锁芯压铸模不同的浇注系统和溢流系统进行模拟,分别观察液态金属充型及凝固过程中流场和温度场的分布。
4) spillway dam
溢流坝
1.
Study of design of adding drainage system in section of Fengman spillway dam;
丰满大坝溢流坝段增设排水系统设计研究
2.
According to the design of spillway dam on arch dam in Wanjiagou reservoir,this paper elaborates special problems and solving method of spillway dam in design and construction.
本文以万家沟水库拱坝溢流坝的设计为例,阐述了这种坝型设计及施工的一些特殊问题及解决方法。
3.
ased on the conventional empirical formula calculating inverse arc gauges of the spillway dam (including radius and angle of the inverse arc section), a design criterion for determining proper gauges of the arc section is proposed in this paper.
在总结现有选择反弧尺寸(反弧半径R,挑坎角θ)常用经验公式的基础上,提出了选择合理反弧尺寸的设计准则,并在应用溢流坝等效势流假设的基础上,对多组反弧尺寸进行了数值计算。
5) spillway
[英]['spilwei] [美]['spɪl,we]
溢流坝
1.
Numerical simulation of momentum integral equation of turbulent boundary on spillway bucket considering the gravity and centrifugal force;
考虑重力及离心力的溢流坝反弧段紊流边界层动量积分方程的数值计算
2.
Numerical simulation of three-dimensional flow for spillway containing frusta;
含闸墩溢流坝三维过坝水流数值模拟
3.
In this paper the zero-equation model is used to simulate the turbulent boundary layer of a spillway.
采用零方程模型对溢流坝上紊流边界层进行数值模拟,引入流函数Ψ将紊流边界层方程组化为常微分方程。
6) overflow dam
溢流坝
1.
Experimental study on stepped energy dissipation of upper reservoir overflow dam at Huizhou Pumped Storage Power Station;
惠州抽水蓄能电站上库溢流坝阶梯消能试验研究
2.
An analysis of reinforcing projects for sluice piers of an overflow dam;
某溢流坝闸墩除险加固方案分析
3.
Investigation of hydrodynamic characteristics of overflow dam with different types of piers;
不同墩型溢流坝水动力特性研究
补充资料:非溢流重力坝
非溢流重力坝
non-overflow gravity dam
feiyiliu zhongliba非溢流重力坝(non一overflow gravitydam)坝顶不溢流的重力坝。各种型式的重力坝都可以建为非溢流坝。筑坝材料多用混凝土,中小型工程也可用浆砌块石。 在大多数重力坝枢纽中,于河床中部或主流部分布置溢流重力坝,两侧布置非溢流重力坝与岸坡相接,其间用边墩和导墙隔开(见重力坝图2)。少数工程,如中国刘家峡水电站,由于河谷狭窄,需布置电站厂房,岸边又有适宜条件布置溢洪道,经方案比较,设置了河岸式溢洪道,拦河坝全部为非溢流重力坝。非溢流重力坝可根据调洪预泄、放空水库、排沙等运用要求在坝身布置深式泄水孔。当有坝后厂房时,可穿过坝体布置发电引水管。 非溢流重力坝的坝体设有横缝、纵缝、止水、排水、廊道等(见坝体分缝、止水、坝内排水管、坝内廊道)。进行非溢流重力坝剖面设计时,常先拟定基本剖面,再根据运用和施工要求修改成为实用剖面(见重力坝剖面),然后进行详细的稳定和强度计算(见重力坝应力分析和重力坝抗滑稳定),根据计算结果再进行修正。为减小计算工作量,各国已编制了不少重力坝剖面优化程序,可用电算求解。剖面确定后,再进行分缝、止水、排水、廊道、坝内引水管、深式泄水孔等的设计和计算。对坝基稳定和处理应给予足够重视(见大坝岩基处理)。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条