1) stepped spillway
阶梯溢流坝
1.
Hydraulic calculation method for deflecting distance of lower nappe profile in dissipator with flaring gate piers and stepped spillway;
宽尾墩阶梯溢流坝出闸室水舌下缘挑距水力计算
2.
Study on hydraulic structure of flaring gate piers locating at the upstream of stepped spillway;
宽尾墩后接阶梯溢流坝面水工设施的研究
3.
Numerical simulation of characteristics of free-surface aeration on stepped spillway;
阶梯溢流坝自由表面掺气特性数值模拟
2) stepped spillway
阶梯溢流
1.
Aeration of skimming flow on stepped spillway combined with flaring gate piers
与宽尾墩联合使用的阶梯溢流面水流掺气问题研究
3) stepped spillway
台阶溢流坝
1.
Study on the flow aeration to prevent caviation of stepped spillway for Dachaoshan Hydroelectric Station;
大朝山水电站台阶溢流坝掺气减蚀问题的研究
2.
This paper analyses the problem of flow aeration for mitigating cavitation on stepped spillway.
根据大朝山水电站表孔减压模型试验资料,结合原型观测有关资料,对台阶溢流坝掺气减蚀问题进行了分析研究。
4) stepped overflow dam
台阶式溢流坝
1.
The characteristics of mean pressure on stepped overflow dam;
台阶式溢流坝的时均压强特性
5) stepped spillways
台阶式溢流坝
1.
Stepped spillways is a type of new spillway structure.
台阶式溢流坝是一种全新的泄水建筑物形式。
6) benched spillway face
阶梯式溢流面
1.
Research on hydraulic characteristic regularity for benched spillway face;
阶梯式溢流面水力特性规律研究
补充资料:非溢流重力坝
非溢流重力坝
non-overflow gravity dam
feiyiliu zhongliba非溢流重力坝(non一overflow gravitydam)坝顶不溢流的重力坝。各种型式的重力坝都可以建为非溢流坝。筑坝材料多用混凝土,中小型工程也可用浆砌块石。 在大多数重力坝枢纽中,于河床中部或主流部分布置溢流重力坝,两侧布置非溢流重力坝与岸坡相接,其间用边墩和导墙隔开(见重力坝图2)。少数工程,如中国刘家峡水电站,由于河谷狭窄,需布置电站厂房,岸边又有适宜条件布置溢洪道,经方案比较,设置了河岸式溢洪道,拦河坝全部为非溢流重力坝。非溢流重力坝可根据调洪预泄、放空水库、排沙等运用要求在坝身布置深式泄水孔。当有坝后厂房时,可穿过坝体布置发电引水管。 非溢流重力坝的坝体设有横缝、纵缝、止水、排水、廊道等(见坝体分缝、止水、坝内排水管、坝内廊道)。进行非溢流重力坝剖面设计时,常先拟定基本剖面,再根据运用和施工要求修改成为实用剖面(见重力坝剖面),然后进行详细的稳定和强度计算(见重力坝应力分析和重力坝抗滑稳定),根据计算结果再进行修正。为减小计算工作量,各国已编制了不少重力坝剖面优化程序,可用电算求解。剖面确定后,再进行分缝、止水、排水、廊道、坝内引水管、深式泄水孔等的设计和计算。对坝基稳定和处理应给予足够重视(见大坝岩基处理)。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条