1) Shisanling Pumped-storage Power Plant
十三陵抽水蓄能电站
1.
study on initial ground stress in the area of underground power house of Shisanling Pumped-storage Power Plant;
十三陵抽水蓄能电站地下厂房区初始地应力研究
2.
Construction of large-span underground powerhouse of Shisanling Pumped-storage Power Plant;
十三陵抽水蓄能电站大跨度地下厂房施工
3.
Construction supervision in the underground works of Shisanling Pumped-storage Power Plant;
十三陵抽水蓄能电站地下工程的施工监理
2) Shisanling Pumped Storage Power Plant
十三陵抽水蓄能电厂
1.
In order to guarantee the safe operation of the hydraulic buildings of the Upper-Reservior of the Shisanling Pumped Storage Power Plant, DG distributed dam safety automatic monitoring system is equipped.
为了能够保证十三陵抽水蓄能电厂上水库水工建筑物的安全运行,安装了DG型分布式大坝安全自动化监测系统,对所埋设的仪器电缆及系统防雷均采取了有效的措施,并取得了良好的效果,为其他采用人工监测的类似工程提供了借鉴。
3) Shisanling pumped storage station
十三陵蓄能电站
1.
Title:Design on the monitoring automation system and its operation in Shisanling pumped storage station;
十三陵蓄能电站上水库自动监测系统的设计及运行
4) Shisanling Pumped storage Power Plant
十三陵蓄能电厂
1.
Because the water diversion system of Shisanling Pumped storage Power Plant is located in the mountainous body with complex geological conditions, the diversion tunnel section behind the gate is required to conduct reinforced concrete lining and consolidation grouting.
由于十三陵蓄能电厂引水系统所在山体地质条件复杂 ,要求闸后段引水隧洞进行钢筋混凝土衬砌和固结灌浆 ,为此在闸后段 1、2号隧洞之间、引水调压井前增设了两个上百米的测压管CY1、CY2 ,以便观测该段隧洞内水外渗及地下水位情况。
2.
The inlet/outlet gates of upper reservoir of Shisanling Pumped storage Power Plant have been locked since the operation of the Plant.
十三陵蓄能电厂上池进出水口闸门 ,自投产以来一直处于锁定状态 ,为了确保电厂水道和地下厂房的安全 ,使上池进水口闸门正式投入运行 ,对其控制系统进行了改造。
3.
In order to realize the remote control of generating unit, the remote start up control of Shisanling Pumped storage Power Plant adopts the RTU of the Plant to be responsible for receiving and sending the requirements from central control room and for the information transmission between the supervisory control systems inside the Plant.
为实现机组的远方控制 ,十三陵蓄能电厂远方开机控制由电厂RTU负责收发中调和厂内监控系统相互间的信息传递 ;由 6LCU负责输入、输出中调需要的远方开机信号及监控系统内部的信息传递 ,RTU只与监控系统 6LCU现地控制单元有信号互递 ,实现了“四遥”功
5) pumped-storage hydroelectric plant
抽水蓄能水电站
6) pumped storage power station
抽水蓄能电站
1.
Research on preloading filling spiral case structure in large pumped storage power station;
大型抽水蓄能电站充水保压蜗壳结构分析
2.
Study of three-part electricity price with consideration of dynamic assistant service of pumped storage power stations;
考虑抽水蓄能电站动态辅助服务的三部制电价研究
3.
The Application of KKS Identification System in Tai an Pumped Storage Power Station;
KKS标识系统在泰安抽水蓄能电站的应用
补充资料:十三陵抽水蓄能电站
十三陵抽水蓄能电站
Shisanling Pumped Storage Station
十三陵抽水蓄能电站(S hisanhng Pum加dStoragestation)为改善北京峰荷电力供应而兴建的大型抽水蓄能电站。位于北京昌平县十三陵。总装机容量80万kw。电站利用十三陵水库作下池水库,在其左岸山顶建造上他水库。上池水库有效库容430万m“。安装4台2。万kw混流式可逆抽水蓄能电机。采用美国VOITH公司生产的水泵水轮机,发电电动机系意大利ELIH公司生产。高压配电装置为全封闭组合电器(GIS),系ABB公司产品。电站总投资40亿元,是中国八五计划重点工程。电能经22OkV升压变压器升压后由220kV输电线路接人华北电力系统。第一台机组于1995年12月并网发电。该电站对北京地区的电能供应和提供峰荷电源将起重要作用。 〔邱景安黄成轰)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条