1) the Shisanling Pumped Storage Power Station
十三陵电站
1.
Influence of Water Storaging on the Upper Pool Dam of the Shisanling Pumped Storage Power Station;
水库蓄水对十三陵电站上池大坝的影响
2) Shisanling pumped storage station
十三陵蓄能电站
1.
Title:Design on the monitoring automation system and its operation in Shisanling pumped storage station;
十三陵蓄能电站上水库自动监测系统的设计及运行
3) Shisanling Pumped-storage Power Plant
十三陵抽水蓄能电站
1.
study on initial ground stress in the area of underground power house of Shisanling Pumped-storage Power Plant;
十三陵抽水蓄能电站地下厂房区初始地应力研究
2.
Construction of large-span underground powerhouse of Shisanling Pumped-storage Power Plant;
十三陵抽水蓄能电站大跨度地下厂房施工
3.
Construction supervision in the underground works of Shisanling Pumped-storage Power Plant;
十三陵抽水蓄能电站地下工程的施工监理
4) Shisanling Pumped storage Power Plant
十三陵蓄能电厂
1.
Because the water diversion system of Shisanling Pumped storage Power Plant is located in the mountainous body with complex geological conditions, the diversion tunnel section behind the gate is required to conduct reinforced concrete lining and consolidation grouting.
由于十三陵蓄能电厂引水系统所在山体地质条件复杂 ,要求闸后段引水隧洞进行钢筋混凝土衬砌和固结灌浆 ,为此在闸后段 1、2号隧洞之间、引水调压井前增设了两个上百米的测压管CY1、CY2 ,以便观测该段隧洞内水外渗及地下水位情况。
2.
The inlet/outlet gates of upper reservoir of Shisanling Pumped storage Power Plant have been locked since the operation of the Plant.
十三陵蓄能电厂上池进出水口闸门 ,自投产以来一直处于锁定状态 ,为了确保电厂水道和地下厂房的安全 ,使上池进水口闸门正式投入运行 ,对其控制系统进行了改造。
3.
In order to realize the remote control of generating unit, the remote start up control of Shisanling Pumped storage Power Plant adopts the RTU of the Plant to be responsible for receiving and sending the requirements from central control room and for the information transmission between the supervisory control systems inside the Plant.
为实现机组的远方控制 ,十三陵蓄能电厂远方开机控制由电厂RTU负责收发中调和厂内监控系统相互间的信息传递 ;由 6LCU负责输入、输出中调需要的远方开机信号及监控系统内部的信息传递 ,RTU只与监控系统 6LCU现地控制单元有信号互递 ,实现了“四遥”功
5) Ming tombs
十三陵
1.
Ba daling great wall and the Ming tombs scenery site is one of the first key scenery spot which State Department authorized in November,1982.
八达岭—十三陵风景名胜区是1982年11月经国务院批准的第一批全国重点风景名胜区之一。
6) Shisanling Pumped Storage Power Plant
十三陵抽水蓄能电厂
1.
In order to guarantee the safe operation of the hydraulic buildings of the Upper-Reservior of the Shisanling Pumped Storage Power Plant, DG distributed dam safety automatic monitoring system is equipped.
为了能够保证十三陵抽水蓄能电厂上水库水工建筑物的安全运行,安装了DG型分布式大坝安全自动化监测系统,对所埋设的仪器电缆及系统防雷均采取了有效的措施,并取得了良好的效果,为其他采用人工监测的类似工程提供了借鉴。
补充资料:十三陵
十三陵 中国明代自成祖以下13个皇帝陵墓。因明初定都南京,明太祖朱元璋墓在南京东郊(见明孝陵)。后迁都北京,十三陵便建在北京市昌平县天寿山下。1961年国务院公布为中国全国重点文物保护单位。陵区周围40千米,四周依山设围墙。各陵以长陵为中心,向左右排列。陵门大红门前有石牌坊和下马碑,门内有神路通往各陵。神路以“大明长陵神功圣德碑”亭为起点,后有整块白石雕成的石兽24个,石人12个和棂星门。各陵皆背山而建,方向不同,但建筑布局一致。陵门前有无字碑,碑前建石桥与神路相接。陵前部为宫院,有祾恩门、祾恩殿、牌楼门、石几筵等。后有圆形宝城,宝城上建明楼,城内圆形封土下是埋葬帝、后的地宫。所有建筑均在一条轴线上,自前向后地势逐渐增高。十三陵的方城圜丘制度与明孝陵一脉相承。其中定陵于1956~1958年发掘,地宫已建成定陵博物馆,对外开放。
定陵为明神宗朱翊钧与孝端、孝敬皇后的陵墓。在十三陵陵区的中部偏西处。始建于万历十二年(1584),万历四十八年入葬。历时6年完工,耗银800万两,为当时全国两年赋税收入的总和。地面建筑在清初遭严重破坏,现建筑是清乾隆时重建,已被简化。定陵的陵园建筑与各陵基本相同,地宫在宝城封土下,由前、中、后殿和左、右配殿组成,全部为石结构。各殿间有石门相通,用自来石顶门封闭。中殿设石供案、黄琉璃、五供、长明灯等。万历皇帝和两皇后的棺椁置于后殿棺床上。所出土的随葬品均为当时最高等级的用品,包括谥册、谥宝、金银玉瓷器及帝后服饰等,对研究文物制度有重要价值。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条