说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 主蒸汽管道弯管
1)  elbow of main steam pipe
主蒸汽管道弯管
1.
To protectthe safety of main steam pipe,the formula of stress in elbow of main steam pipe is derivated with mechanical theory and ultilizing the formula 0f stress-strain gains the farmula of creep.
为保证主蒸汽管道系统的安全运行,运用力学理论推导主蒸汽管道弯管应力表达式,利用应力一应变关系式求得蠕变变形表达式。
2)  main steam curved pipe
主蒸汽弯管
3)  main steam pipe
主蒸汽管道
1.
Appraisal of microstructure and mechanical properties for the 12Cr1MoV steel main steam pipe after 190 thousand hours running;
12Cr1MoV钢主蒸汽管道运行19万小时后的组织性能评定
2.
Comparison Selection on Materials for Main Steam Pipe of Ultra-supercritical Unit
超超临界机组主蒸汽管道选材比较
3.
73MPa pressure,the main steam pipe in a thermal power plant,especially the bends were badly damaged.
高温持久强度试验和微观结构分析显示,某热电厂F12主蒸汽管道经16。
4)  main steam piping
主蒸汽管道
1.
Supervisory control of welding quality of main steam piping made of A335 P91 steel in thermal power plants has ensureed the welding quality.
对火力发电厂采用A335P91钢的主蒸汽管道安装焊口进行了焊接质量监控 ,保证了焊接质量 ,并介绍了监控的主要内容 ,提出了一些需要注意的问题。
2.
In a power plant, water is found accumulated in main steam piping of the SIEMENS made 660 MW steam turbine after shutdown,it even leads to water running into the steam turbine.
针对某电厂西门子660MW机组发生的机组停运后主蒸汽管道积水、甚至造成汽轮机进水的问题进行了认真地原因分析和研究,并依据ASME标准对外方的设计提出了更加安全可靠的改进方案,从而提高了机组的安全可靠性。
3.
Based on the experiment and theoretical analysis, the residue life of the main steam piping made of heat resistance steel 12CrlMoV was estimated after the piping had been used for 126691 hours.
通过实验和理论分析 ,对已服役126691小时的12Cr1MoV耐热钢主蒸汽管道的剩余寿命进行了评估 ,从而为电厂高温部件金属技术监督与寿命管理提供了理论依
5)  main steam pipeline
主蒸汽管道
1.
State test and assessment of the main steam pipeline of 1 # boiler;
锅炉主蒸汽管道状态检验与评估
2.
Study on operation life of P92 steel thin-walled main steam pipeline in ultra-supercritical unit
超超临界机组P92钢薄壁主蒸汽管道运行寿命研究
3.
Directing againt the problem of joint interface misplacement occurred between the main steam pipeline and the main steam valve of a 220 MW heat-supplying unit in one power plant,the causes resulting in misplacement and its influence upon thrust on the port of said main steam valve have been analysed,and disposal measure,i.
针对某电厂200MW供热机组主蒸汽管道与主汽阀发生的接口错位问题,分析了其产生的原因及其对主汽阀端口推力的影响,提出了通过支吊架载荷重新配置来减小主蒸汽管道对主汽阀垂直方向推力的处理措施,并对措施的安全性进行了评价。
6)  steam bend pipes
蒸汽弯管
补充资料:高温蒸汽管道寿命


高温蒸汽管道寿命
life time of steam pipings

  有问题时进行。 综合分析法较普遍的用于直管段材质寿命预侧,也可用于弯管等。是通过对超期运行燕汽管道的普查,然后选取一段或几段有代表性的管段进行鉴定试脸,再根据试验结果得出超期运行后钢管材料的组织性能水平,综合普查结果,分析确定可继续安全运行的时间.普查的目的:①了解运行历史,尤其是运行超温情况和历次姗变测t结果;②查清宏观缺陷情况,消除超标缺陷;③查清钥号和组织,消除错用钢材,了解金属组织性能变化程度,如球化程度等;④检查支吊架,消除缺陷并调整;⑤取出有代表性的管段,用于鉴定试验。鉴定试验包括钢的化学成分,室温和运行温度下的力学性能,金相组织检验,碳化物分析,姗变和持久强度试验以及考虑调峰及频繁起停工况时的姗变疲劳交互作用试验等.综合分析时除主要考虑持久强度值外,还孺综合考虑其他试验结果以及管道蠕变测量结果等,然后做出结论。限于持久强度外推时间限制,每次分析确定的可继续安全运行的时间最长为losh。对于超期运行的高温燕汽管道,综合分析法可在上次预侧寿命将到达时再次继续应用。 姗变空洞及裂纹检查法主要用于弯管、焊缝、三通、阀门等部件.对弯管外弯面、阀门壳体变截面处、三通肩部和腹部以及焊缝等应力集中地区作宏观峨变裂纹或疲劳裂纹检查.发现裂纹即行修补或更换。用复膜金相法作姗变空洞检验。检查部位与宏观姗变裂纹检查相同。利用如附图所示的与蟠变曲线的关系或峨变空洞量与寿命损耗程度的关系来决定其剩余寿命。黝耀铡崛 (h)(‘,怕》、(b)圈中熟点表示空洞、(‘)、(d,圈中己出现晶间裂纹 蟠变空洞与场变曲线的关系示意图 离皿燕汽,道的班寿主要延寿措施集中在弯管等易于应力集中的部件上,因为这些部件的寿命比直管短。主要延寿措施有设计时使弯管壁厚加厚并大于直管段。另外,也可用管道支吊架调整方法来使高温管goowen Zhengq一guondoo shoum一ng离温燕汽管道寿命(life time of steam pip-ings)高温蒸汽管道从开始运行至失效时的累计运行时间。火力发电厂的高温蒸汽管道主要指主蒸汽管道(包括母管)、高温再热蒸汽管道和导汽管等,是火电厂的重要高温部件。由于布里在锅炉和汽轮机之外,且用大口径钢管制造,一旦失效则会发生灾难性事故,因此研究并把握高温燕汽管道寿命,特别是超期运行电厂的蒸汽管道寿命,具有很重要的意义。 高温蒸汽管道设计寿命取决于管道设计时所取的持久强度极限的时间条件值。如取10”h或2X105h的持久强度极限作管道强度设计指标,则其设计寿命相应为10sh或2 xlo‘h。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条