1) steel tube concrete column
钢管高强砼柱
2) concrete filled steel tubular column
钢管砼柱
1.
This article describes the key construction technology and quality control of concrete filled steel tubular column of certain high rise building.
介绍高层建筑钢管砼柱的关键施工技术和质量控制方法 ,包括钢管柱的制作、组焊、安装、混凝土浇筑、坍落度调整、高位抛落并振捣的方法及钢管砼柱的质量检查方法
2.
The fire behaviors of six concrete filled steel tubular columns insulated using cement mortar with a thickness of 50mm were tested under ISO834 standard fire.
根据 ISO834标准升温条件,开展了六根采用水泥砂浆防火保护层(厚度50mm)的钢管砼柱的耐火性能试验研究。
3) short column of steel tube concrete
钢管砼短柱
5) steel tube concrete column eccentric loads
钢管砼偏压柱
1.
Improvement on the coefficient K 2 in calculating steady bearing capacityof steel tube concrete column eccentric loads;
钢管砼偏压柱稳定承载力计算中系数K_2的改进
6) high strength CFST columns
钢管高强混凝土柱
1.
Meanwhile the effectiveness of the formulation of compression-bending capacity of high strength CFST columns is studied and analyzed.
本文对钢管高强混凝土柱进行低周反复水平荷载作用的试验,得到了不同轴压比情况下的滞回曲线及骨架曲线,讨论了钢管高强混凝土柱压弯承载力计算公式的适用性。
补充资料:钢管混凝土柱刚架结构
钢管混凝土柱刚架结构
撇 钢管混凝土柱刚架结构
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条