1) construction surveying schedule
施工测量方案
2) Construction scheme
施工方案
1.
Construction scheme for Xujiahui hub of Shanghai rail transit;
上海轨道交通徐家汇枢纽施工方案研究
2.
Transitional construction scheme of communication equipments in the running railway line;
营业线通信设备过渡施工方案
3.
On the secondary lining construction scheme of tunnel;
隧道二次衬砌施工方案的探讨
3) construction project
施工方案
1.
Application of grey system in decision-making on construction project of moulding board of shearing force wall;
灰色系统在剪力墙模板施工方案决策中的应用
2.
Fuzzy Opitimize Model of Multi-goal Decision-making in Construction Project;
施工方案的多目标决策模糊优化模型
3.
Decision-Making of construction project is a large system which consists of multiple target,complex structure and numerous factors.
大型工程施工方案的评价决策是一个多目标、结构复杂、因素众多的大系统。
4) construction plan
施工方案
1.
The application of analysis method for technical economic in priority election of construction plan;
技术经济分析方法在施工方案优选中的应用
2.
Lifting construction plan of deck steel tubular arch of Jingyanghe Bridge;
景阳河大桥上承式钢管拱的吊装施工方案
3.
The choice of construction plan in metallurgical project preparation;
冶金工程施工组织设计中施工方案的选择
5) construction schemes
施工方案
1.
The relations between construction organization design construction schemes and technical intentions;
施工组织设计和施工方案及技术交底的关系
2.
The Construction Schemes and Controlling Technology of Wenzhouliao Bridge (a Continuous Rigid-frame Bridge) of Qingjingqing Highway in Zhejiang Province;
浙江省庆景青公路温州寮大桥(连续刚构桥)施工方案及控制技术
3.
The construction schemes and blast parameters were presented in detail.
在此基础上,将顶部卸压法实施于井下,详细介绍了其施工方案与爆破参数。
6) construction program
施工方案
1.
The 32 m cast-in-place box beam span railway construction program of high-speed railway;
高速铁路32m现浇箱梁跨铁路施工方案
2.
Study on construction program of renovation against damaged trackbed of tunnel;
隧道出口段道床病害整治施工方案研究
3.
Technically efficient and economically proper construction program is chosen by technical economic comparison of two construction programs of 1m-16m hollow plate girder.
通过对1m~16m空心板梁两种施工方案的技术经济比较,选定技术可行、经济合理的施工方案。
补充资料:工程施工控制测量
工程施工控制测量
【工租施工控侧侧.】为工程的定线放样而建立各种控制网的测量工作。为便于对主体工程的控制和施工放样,施工平面控制网多以主体建筑物的主轴线为依据扩展网形。建筑工程施工控制网多是布设成为与主要建筑物相互平行的方格网。在点位布设方面,重要建筑物的主轴线上,均应布有控制点。在精度方面,应能保证各种工程放样的不同要求。施工控制测量方法视工程的性质而定,对于建筑方格网而言,是先根据测图控制网点,放样出它的主轴线,然后从主轴线初步放样出全网的各点,再精密测出各点的实际坐标,然后,以各点的设计坐标为准进行点位改正并埋设牢固的点位标志。施工控制网多用假定的施工坐标系统。它是整个施工期间定线放样,峻工验收的依据。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条