说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 工程施工方案
1)  scheme of project construction
工程施工方案
1.
This article presents the application in geological prospecting about three basic problems, that are prospectnet, scheme of project construction, link of prospecting and exploits, and some opinions are put out.
论述了勘探网度、工程施工方案和探采结合等三个问题在地质探矿阶段的应用,并提出一些工作思路和方法。
2)  constructing measure
工程措施方案
1.
According to Analysis on Binding Force of Construction Measure in the Works with Bill Quantity Valuation, the paper put forward that, as the main part of tender document, constructing measure should be used as main basis of construction organization design after winning a bid ,and be brought into contract management.
通过对《清单计价下工程措施方案的约束力分析》有关观点的讨论,认为根据《合同法》规定,投标工程措施方案是投标文件的主要组成部分,应当作为标后施工组织设计的主要依据,并纳入合同管理;同时,由于主客观条件的变化,标后施工组织设计的修订、补充及完善也不可避免,但并不构成业主不可限制的理由,理应得到批准后方可实施,以维护公平和效率原则,实现投标承诺的目的。
2.
Starting from clarifying the constructing measure position in the project contract,this paper gives an analysis both on the generality and the particularity of the binding force separately from the angles of fairness and efficiency.
从梳理工程措施方案的合同地位入手,分别从公平和效率的角度对工程措施方案约束力的一般性和特殊性进行深入剖析。
3)  Construction scheme
施工方案
1.
Construction scheme for Xujiahui hub of Shanghai rail transit;
上海轨道交通徐家汇枢纽施工方案研究
2.
Transitional construction scheme of communication equipments in the running railway line;
营业线通信设备过渡施工方案
3.
On the secondary lining construction scheme of tunnel;
隧道二次衬砌施工方案的探讨
4)  construction project
施工方案
1.
Application of grey system in decision-making on construction project of moulding board of shearing force wall;
灰色系统在剪力墙模板施工方案决策中的应用
2.
Fuzzy Opitimize Model of Multi-goal Decision-making in Construction Project;
施工方案的多目标决策模糊优化模型
3.
Decision-Making of construction project is a large system which consists of multiple target,complex structure and numerous factors.
大型工程施工方案的评价决策是一个多目标、结构复杂、因素众多的大系统。
5)  construction plan
施工方案
1.
The application of analysis method for technical economic in priority election of construction plan;
技术经济分析方法在施工方案优选中的应用
2.
Lifting construction plan of deck steel tubular arch of Jingyanghe Bridge;
景阳河大桥上承式钢管拱的吊装施工方案
3.
The choice of construction plan in metallurgical project preparation;
冶金工程施工组织设计中施工方案的选择
6)  construction schemes
施工方案
1.
The relations between construction organization design construction schemes and technical intentions;
施工组织设计和施工方案及技术交底的关系
2.
The Construction Schemes and Controlling Technology of Wenzhouliao Bridge (a Continuous Rigid-frame Bridge) of Qingjingqing Highway in Zhejiang Province;
浙江省庆景青公路温州寮大桥(连续刚构桥)施工方案及控制技术
3.
The construction schemes and blast parameters were presented in detail.
在此基础上,将顶部卸压法实施于井下,详细介绍了其施工方案与爆破参数。
补充资料:工程施工


工程施工
execution of construction

gongeheng sh一gong工程施工(execution of。onstruetion)按工程设计文件和设备制造厂提供的技术文件要求进行的建筑安装工作。施工阶段是工程项目具体实施建筑安装作业的阶段。施工承包商应按承包合同规定的工程范围、工期、质量、责任等方面的要求进行工程施工。电力工程施工包括施工准备、土建工程施工、安装工租施工、设备分部试运行、整套启动调试和竣工移交。 电力工程施工的特点是:①涉及设计、制造、生产、运输、物资供应、地方关系以及有关单位等多个方面的协作配合;②施工周期长,投入的资金、人力、物力多;③土石方、混凝土、金属结构、电缆、管道等工程量大;④露天作业、高处作业、交叉作业多;⑤高沮、高压、精密设备多,自动化程度高,技术复杂;⑥水电工程建筑施工的导流和截流,大坝的稳定、防渗、抗冲、承压,水力机械的耐磨、防蚀等,需要采取特殊的措施;⑦施工现场经常有多个施工单位同时施工,需要统一指挥,协调配合等。 工程施工需要严格按施工图进行,并执行有关的施工规程、规范、标准,以确保工程的质量;需要加强安全工作,认真执行安全法令和规章制度,以确保职工人身安全和设备安全。 工程施工要有周密细致、科学合理的计划安排.按顺序施工.一般要遵循先地下后地上、先主体后外围、先主机后辅机、先设备后管道的施工顺序,必要时可以调整施工顺序,以满足总体计划工期的要求,使工程能按规定工期竣工投产,发挥投资效益。 电力建设工程施工要采用系统工程理论及现代化管理手段和方法,推行全面质t管理和计算机的应用,建立完善的施工质t体系,使有关计划、技术、质量、安全、组织、统计、设备、物资、劳动、工资、财务、成本、定额等各项管理工作做到标准化、规范化。 工程施工要严格执行工程质t验收程序,一般按分段工程、分项工程、分部工程、单位工程、总体工程进行检查验收。施工单位除执行内部三级检查验收制度外,还要根据工程项目的重要程度,由建设单位、监理单位、地方政府的工程质监站、质监中心站主持检查验收。上一道工序检查验收合格后才能进行下一道工序的施工,单位工程检查验收合格后才能参加整套试运行;完成整套试运行后,进行总体工程检查验收,对该工程设计、设备制造、施工调试和生产准备工作全面检验合格后,工程才能移交生产运行单位;工程移交后,还要通过半年或一年试生产、达标投产考核和质保期,工程施工才告完成。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条