说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 追加投资回收期法
1)  method of return period on additional investment
追加投资回收期法
2)  additional investment payback period
追加投资回收期
3)  additional investment recovery period
追回投资回收期
1.
The dynamic calculation of the additional investment recovery period was discussed on the theoretical basis of the original compersation period calcuation.
在原抵偿年限计算的理论基础上,对追加投资回收期的动态计算进行探讨,采用了以设计方案的投资回收年限,替代原规定的标准年限值,对追回投资回收期的结果进行评价,从中选择最优工程方
4)  payback method
回收期法,投资回收期法
5)  payback period method
投资回收期法
1.
In this paper,payback period method is used to study how the enterprises choose new invested projects with the growth of labor cost,which is of great significance in investment decision.
采用投资回收期法,研究在人工成本增长到何种情况下,企业应该选择进行新项目的投资,对企业的投资决策具有重要的借鉴意义。
6)  Investment recovery period
投资回收期
1.
56%, investment recovery period was 3.
56%,投资回收期3。
2.
The understanding of FIRR, FNPV and investment recovery period is also given a popular explanation in this paper.
根据实际筹资情况对全部投资现金流量表计算指标进行思考和修正,并对FIRR、FNPV和投资回收期等指标的理解给予通俗的解释。
3.
In order to provide reference for efficient management and scientific and rational investment,investment and output of Ganwu series demonstration forest in Camellia oleifera clone in Baitu Town of Fengcheng City were analyzed,and cash flow and investment recovery period were predicted by technical economy analysis method.
为给油茶的高效经营提供经济效益参考和科学合理投资的依据,调查分析了丰城白土镇赣无系列油茶示范林的投入产出情况,并采用技术经济分析方法预测其现金流量和投资回收期。
补充资料:历期预测法(见发生期预测)


历期预测法(见发生期预测)


  历期预测法见发生期预测。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条