1)  displacement pile
排土桩
2)  Dumping
排土
1.
In Fujiawu digging area of Dexing Copper Mine,dumping work is carried out by electrical dump truck associated with bulldozer.
江铜集团德兴铜矿富家坞采区采用电动轮汽车和推土机联合排土方式,基建开始时,排土场标高为+500m,排土场底部标高为+240~+260m,排土阶段高度为240~260m,随着采区开采台阶的下降,先后启用的410m、380m排土场,其段高均大于"中国恩菲有色工程设计研究院"初步设计的90m排土段高。
3)  Dumping by overburden spreader
排土机排土
4)  waste dump
排土场
1.
Construction and rehabilitation of the waste dump of open pit coal mine of La Martinie (France);
法国复LAMARTINIE露天煤矿的排土场建设及其生态恢复
2.
The Decision Analysis of the Installation of Temporary Waste Dump in Surface Mines of Approximate Horigontal Deposit;
近水平矿床露天矿设置境界内临时排土场的决策分析
3.
Fractal characteristic of size distribution of bulky rock material in waste dump of open pit mines;
露天矿排土场散体岩石粒度分布的分形特征
5)  dumping site
排土场
1.
Analysis of the soil leachate of mining dumping site contaminating groundwater;
排土场溶水对地下水污染的分析
2.
Study of slope stability of Yuemingshan dumping site;
月明山排土场边坡稳定性研究
3.
Alternatives of selection of dumping site and dumping technology for Jiandong Iron Ore Mine;
太钢尖东铁矿排土场及排土方案选择
6)  waste-dump
排土场
1.
The stability research of Waitoushan waste-dump;
歪头山铁矿上盘排土场稳定性研究
2.
Stability analysis of Waitoushan mine waste-dump slope;
歪头山矿排土场边坡稳定性分析
3.
Stability of waste-dump slopes based on critical sliding field technology;
基于临界滑移场技术的排土场边坡稳定性分析
参考词条
补充资料:土桩挤密法
      按预定平面位置,采用沉管、冲击或爆破等方法成孔,然后在孔中填以素土(粘性土)或灰土,分层捣实,形成土桩。土桩与挤密后的桩间土组成复合地基,共同承受基础所传递的荷载。此法常用于处理湿陷性黄土地基、 杂填土地基和填土地基,处理深度一般为5~10米,最大处理深度可达15米以上。处理后的地基承载力一般提高50~100%。
  
  土桩(包括灰土桩)挤密地基的桩径、桩距和孔深通过试验求得。桩孔直径一般为30~50厘米,桩距(桩孔的中心距离S)约为桩孔直径的2~3倍,可按下式确定:
  
  
  
   式中d为土桩的设计直径;γd为地基挤密前,土的平均干容重;γ媁为地基挤密后,桩间土的平均干空重。
  
  桩孔宜按等边三角形的顶点布置。桩孔深度,可根据土中应力分布及下式确定:
  
  
  
  
    Pz+Pcz≤Ps式中Pz为土桩底标高处的附加压力;Pcz为土桩底标高处的土自重压力;Ps为土桩持力层土的湿陷起始压力或容许承载力。
  
  自50年代开始,中国应用土桩挤密法对西北地区某些建筑物的湿陷性黄土地基进行处理,获得了良好的技术经济效果。自70年代起,这种方法已用于民用建筑物的地基处理。用灰土桩挤密地基是60年代在土桩挤密法的基础上发展起来的,两者的作用和工艺、设备基本上相同。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。