1)  Disposal program
排土规划
2)  Dumping
排土
1.
In Fujiawu digging area of Dexing Copper Mine,dumping work is carried out by electrical dump truck associated with bulldozer.
江铜集团德兴铜矿富家坞采区采用电动轮汽车和推土机联合排土方式,基建开始时,排土场标高为+500m,排土场底部标高为+240~+260m,排土阶段高度为240~260m,随着采区开采台阶的下降,先后启用的410m、380m排土场,其段高均大于"中国恩菲有色工程设计研究院"初步设计的90m排土段高。
3)  Dumping by overburden spreader
排土机排土
4)  waste dump
排土场
1.
Construction and rehabilitation of the waste dump of open pit coal mine of La Martinie (France);
法国复LAMARTINIE露天煤矿的排土场建设及其生态恢复
2.
The Decision Analysis of the Installation of Temporary Waste Dump in Surface Mines of Approximate Horigontal Deposit;
近水平矿床露天矿设置境界内临时排土场的决策分析
3.
Fractal characteristic of size distribution of bulky rock material in waste dump of open pit mines;
露天矿排土场散体岩石粒度分布的分形特征
5)  dumping site
排土场
1.
Analysis of the soil leachate of mining dumping site contaminating groundwater;
排土场溶水对地下水污染的分析
2.
Study of slope stability of Yuemingshan dumping site;
月明山排土场边坡稳定性研究
3.
Alternatives of selection of dumping site and dumping technology for Jiandong Iron Ore Mine;
太钢尖东铁矿排土场及排土方案选择
6)  waste-dump
排土场
1.
The stability research of Waitoushan waste-dump;
歪头山铁矿上盘排土场稳定性研究
2.
Stability analysis of Waitoushan mine waste-dump slope;
歪头山矿排土场边坡稳定性分析
3.
Stability of waste-dump slopes based on critical sliding field technology;
基于临界滑移场技术的排土场边坡稳定性分析
参考词条
补充资料:城市总体规划与国土规划、区域规划的关系

国土规划、区域规划、城市总体规划是在不同层次、涉及不同地域范围的发展规划。国土规划、区域规划、城市总体规划组成一个完整的规划系列,国土规划和区域规划应当是城市总体规划的重要依据。而全国和区域性的江河流域、土地利用等专业规划则是国土和区域规划的重要组成部分,城市土地利用规划又是城市总体规划的重要组成部分。
我国的国土规划、区域规划以及江河流域规划、区域性土地利用总体规划等工作起步较晚,目前正在有计划、有重点地逐步展开,还没有法定的审批程序和审批成果。而全国绝大多数城市总体规划已经各级政府按法定程序审批,并在不断完善和深化,在实际工作中存在着相互联系和交叉的情况,因此本法原则确定应当相互协调的关系是必要的。