1) Husonghe Hydropower Station
户宋河电站
1.
Experience from the Forming of Engineering Landslide on the Right side of Chute Spillway at Husonghe Hydropower Station;
户宋河电站溢洪道工程滑坡的形成及经验教训
2) earth dam of Husonghe power station
户宋河电站主坝
1.
The mathematical statistics is applied to analyze the quality indexes of earth filling in the four zones, which are L-shaped drainage body, upstream dam, downstream dam and contact clay, of the earth dam of Husonghe power station.
采用数理统计方法,对户宋河电站主坝的L 型排水体、上游坝体、下游坝体、接触粘土四个分区的填筑质量的检测指标进行统计分析。
3) Shapotou Water Control Project
河床电站
1.
The Design of Tailwater Gate Hoist Bridge at the Power Station in River Channel of Shapotou Water Control Project;
黄河沙坡头水利枢纽工程河床电站尾水门机桥设计
4) Jinhe Hydropower Station
金河电站
1.
Concrete mix design and its application for Jinhe Hydropower Station;
金河电站混凝土配合比的设计与应用
2.
Aggregate screening system design for Jinhe Hydropower Station;
金河电站砂石集料筛分系统设计
5) indoor substation
户内变电站
1.
Along with the city construction developed rapidly,indoor substations are increased in town,and the noise developed by the transformer cooling fan and axial-flow fan running makes the noise of the indoor substations become one of the new noise pollution sources of the city.
针对城市建设的发展,市区户内变电站的不断增加,变压器运行产生的噪声、冷却风机和轴流风机产生的噪声,使户内变电站噪声成为城市新的重要噪声污染源之一的问题,分析了噪声的特点,并提出了如何控制户内变电站的噪声和温升的解决方法。
6) customer substation
客户变电站
1.
The design method of customer substation flexible simulation system is proposed in the paper in order to satisfy the demand of customer substation simulator and overcome the defects of traditional simulator in custom-built way.
为了满足客户变电站(简称客户变)仿真系统的需求,克服传统定制式变电站仿真方法的不足,提出了客户变柔性仿真系统的设计方法。
2.
The customer substation is an important part of the power network.
客户变电站是重要的用电系统,文章针对客户变电站接线方式多样、设备类型繁多的特点,提出了层次化的变电站柔性仿真培训系统的体系结构,采用对象模型模板、应用框架、仿真引擎等柔性仿真技术,克服了传统定制开发变电站仿真系统的不足。