说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 防凌爆冰
1)  controlling icicle to explode ice
防凌爆冰
2)  sleet-proof
耐冰凌的,防冰凌的
3)  ice slush
冰凌
1.
Application of fictitious technique in visuality simulation of ice slush;
虚拟现实技术在冰凌可视化模拟中的应用
2.
Taking study on ice slush of Jinan section in Yellow River for example,the flood period of ice slush was tested and analyzed by geo-electricity testing.
以黄河济南段冰凌研究为例,采用地电测试方法对黄河凌汛期典型断面进行了流凌量测试,结果显示:(1)电测深曲线的高频部分与流凌量具有明显的数量关系,高频数值越高,河水中冰凌含量越多,视电阻率值也越大;反之,则流凌量少,故高频曲线与低频曲线的差异可反映河道流凌量的多少。
4)  ice jam
冰凌
1.
Ground resistivity technique measurement for ice jam early warning at freeze-up period of the Yellow River;
黄河封河期冰凌预警地电测试技术研究
5)  ice prevention
防凌
1.
Active functions included increasing water supply, increasing ice prevention guarantee rate and decreasing water interception at Lijin profile; negative included increasing river channel sedimentation and.
其中正面影响包括增加工农业供水量、提高防凌保证率以及减少利津断面断流次数等,负面影响定性分析了补水后下游河道增淤以及对过洪能力的影响。
6)  ice cream
冰激凌
1.
We have used expanded corn flour, manufactured through the processes of squeezing and expanding, to replace the original auxiliary material starch in producing ice cream.
介绍了采用挤压膨化技术生产的膨化玉米粉 ,应用于冰激凌生产中的工艺过程 ,用膨化玉米粉代替原配方中的辅料淀粉。
补充资料:防凌
防凌
ice-jam flood protection
    减免冰凌危害的防御措施。凌洪成因是热力、动力、河道形态等因素的综合作用。按其成因与形态可分为3类:①冰塞洪水。多发生于封冻期。河流封冻过程中,冰花、碎冰大量堆积于固定的冰盖下面,阻塞了部分过流断面,使上游水位抬高而形成。②冰坝洪水。多发生于解冻期,由低纬度流向高纬度的河段,上游先解冻,淌凌至下游而被未解冻冰层所阻,致堆积成冰坝,使上游水位升高,常决堤成灾;而冰坝突决时,又造成下游凶猛的凌洪灾害。③融冰洪水。因冰层融化形成,一般很少造成凌洪灾害。防凌措施主要有:①堤防加培,临时抢护。②利用冰封河段上游水库,在冰封前泄放较大流量,抬高冰盖;或解冻前适时调节水库下泄流量,使不致形成水鼓冰开一拥而下的形势。③解冻前对已形成冰坝的河段进行爆破。④进行河道整治,将弯曲狭窄河段裁弯取直扩宽,避免卡冰结坝。⑤有计划地分泄凌洪。⑥做好冰情预报,及时采取防范措施。此外,对于局部河流和港口,可采取针对性防凌防冰措施。如:对航道可用破冰船破冰;在港岸和船闸附近设空气筛防冻;在结冰前抬高水电站引水渠道中的水位,使流速变缓,促进提前形成冰盖,防止产生水内冰;水工建筑物设计中应考虑冰体膨胀力对建筑物的荷载;或在建筑物的迎水面,设置表底水流交换器防冻;或安放圆浮筒,减少冰压力的传递。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条