2) cable adjustment
扣索调整
1.
A method of simulating the operation of cable adjustment in the rib-assembling computation is proposed by means of the iterative approaches and amending the cable gravity effect.
讨论了拱肋吊装过程中扣索调整的计算问题,综合迭代模拟计算和扣索垂度修正等方法来模拟吊装计算中的扣索调整。
3) cable force adjustment
索力调整
1.
Optimum calculations are made on cable force adjustment for the under-construction Hangzhou Wenhui bridge.
该文介绍了对正在施工中的杭州市文晖大桥进行斜拉索的索力调整的优化计算。
2.
Based on the planar beam finite element method and the influence matrix method,a trial-and-error calculation method was applied to determine the optimal cable force adjustment scheme.
结合天津永和斜拉桥的换索与调索实践,在分析换索后全桥结构性能变化的基础上,阐述索力调整的目标、原则,利用平面杆系有限元程序和影响矩阵法基本原理,采用试算法确定出索力调整方案,分析索力调整的效果。
4) adjustment of cable force
索力调整
1.
The satsfactory content method for the adjustment of cable force in the construction of cable-stayed bridges is proposed in this paper,and how to define the function of satisfactory and content is discussed.
提出了斜拉桥施工时索力调整的满意满足度法 ,给出了满意度、满足度函数的定义方法 。
5) stayed-buckle cable force
扣索索力
1.
Based on the existing algorithm and through ascertaining the influence matrix of the tensile force in the construction of oblique pulling rope,the optimized stayed-buckle cable force is calculated at each stage of archrib hoisting phase of a model bridge during construction and the designed requirement is fulfilled through empty steel tube in falling state.
在讨论现有算法的基础上,通过确定斜拉索施工张拉力的影响矩阵,对扣索索力进行了优化。
6) cable force
扣索索力
1.
Non-bracket and Cable erection is the main erecting arch ribs method of a long span concrete-filled steel-tube(CFST) arch bridge recently,but it requires to adjust the cable force over and over again,which increases the degree of construction difficulty and arch axis linear control trouble,delays the project limit time.
无支架缆索吊装法是目前大跨径钢管混凝土拱桥拱肋节段吊装的主要施工方法,此方法在施工过程中须反复调整扣索索力,施工难度大,拱轴线形控制繁琐,工期长。
2.
Research purposes: By summing up the advantages and disadvantages of using the torque balance method and the finite element "zero displacement method" to determine the cable force,the optimal calculation method is used for the Luobuxi Bridge to guarantee the linear accuracy in arch rib segment of the bridge and construction safety.
研究目的:通过对力矩平衡法和有限元零位移法确定扣索索力的优缺点分析,针对落布溪大桥拟定的扣索方案,采用优化后的计算方法确定最优扣索索力,确保本桥拱肋节段安装的线形精度和施工安全。
3.
Taking Da-ning River Bridge in construction as the engineering background,the optimization analysis of cable forces and segmental cambers has been carried out during the process of arch rib segmental installment.
以在建的大宁河大桥为工程背景,开展拱肋吊装过程扣索索力和预抬量的优化分析。
补充资料:淅淅索索
1.象声词。轻细的擦动声。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条