1.
Cable Force Adjustment and Optimization of Adjusting Sequence of Hongfenghu Long Span Bridge;
红枫湖大桥成桥后索力调整及调索顺序的优化
2.
Static Nonlinear Analysis of Cable-Stayed Bridge and the Adjustment of Stay Cable Forces
斜拉桥静力非线性分析及其索力调整
3.
General Adjustment Method of Cable Forces for Line-Style Control of Cable-Bridges
桥梁缆索体系线型控制的广义索力调整方法
4.
Adjustment of Buckle-cable Forces Under Cable-hoisting Construction of Concrete-filled Steel Tubular Arch Bridges
钢管混凝土拱桥主拱钢管缆索吊装扣索索力调整(英文)
5.
Adjustment of Internal Forces and Displacement of Concern Section tor Suspended Cable Structure
悬索结构关心截面内力、位移的调整
6.
OPTIMIZATION OF STAYED-BUCKLE CABLE FORCES DURING ADJUSTMENT OFTHE LINE-SHAPE ON LONG SPANARCH BRIDGE
大跨度拱桥拱肋线形调整中的扣索索力优化
7.
non-searching self-adjusting system
非搜索性自调整系统
8.
Adjustment of dose-response relationship of industrial impulse noise induced high frequency hearing loss with different exchange rate
用转换系数调整脉冲噪声所致高频听力损失剂量-反应关系的探索
9.
adjustment of electric braking effort
电力制动力的调整[校正]
10.
Method of Adjusting Cable Strand Sagging for Suspension Bridge of Runyang Bridge
润扬大桥悬索桥主缆索股垂度调整方法
11.
The Adjustment of Datum Strand Based on Catenary Equation in Long-Span Suspension Bridges
基于悬链线的大跨度悬索桥基准索股调整
12.
Nonconscious Information Retrieval Models Based on Search Goal Revision
面向检索目标调整的潜意识信息检索模型
13.
Disability-adjusted Life Year
丧失工作能力调整岁数
14.
massive downward pressure
强大的向下调整压力
15.
adjustment of tractive effort
牵引力的调整[校正]
16.
Changing the pressure of thread take-up spring
挑线弹簧1的压力调整
17.
Analyze the Relation between Contract Value Adjustments and Claims;
浅析施工合同价款调整与索赔的关系
18.
LOCATION ANALYSIS OF NEW ECONOMY AND MODULATION OF REGIONAL POLICY;
新经济区位分析与区域政策调整探索