1) deep well pit
沉井基坑
1.
Disscussion on deep well pit dewatering techique of urban large drainage pump station;
城市大型排水泵站沉井基坑降水技术探讨
2) caisson foundation
沉井基础
1.
The caisson foundation construction of Changchun light railway cable-stayed bridge without back-stays;
长春轻轨独塔无背索斜拉桥沉井基础施工
2.
By the formula of criterion,the safety factors of the stability against sliding and overturning are computed for one anchor caisson foundation.
通过规范的相应公式计算了某锚碇沉井基础的抗滑、抗倾覆稳定性安全系数;通过Midas/GTS软件建立了锚碇沉井基础的三维非线性有限元计算模型,并基于有限元分析结果建立了相应的抗滑、抗倾覆稳定安全系数的计算公式,对该锚碇沉井基础的抗滑、抗倾覆稳定安全系数进行了计算。
3) sunk shaft foundation
沉井基础
1.
Study on penetration resistance distribution characteristic of sunk shaft foundation;
沉井基础下沉阻力分布特征研究
2.
The rebuilding scheme fully considers the harmony of the whole bridge with the surrounding environment, meets the planned traffic function requirements and the relative technical standards, puts forward the design of the steel composite beam structure for the main bridge and the technical measures taken for the sunk shaft foundation treat.
该文在对广州市增埗大桥既有桥梁结构安全性评价的基础上,提出增埗大桥改造方案?脑旆桨赋浞挚悸亲芴逵?周围环境的协调,满足规划交通功能要求及相关技术标准,提出主桥钢叠合梁结构设计、旧桥沉井基础处理所采取的技术措施,着重分析设计的重点、难点,可供类似工程借鉴。
3.
In this article, the author analyzes some aspects of false centers in construction of sunk shaft foundations such as formation, reasons and hazards, and states matters need attention in construction and prevention and correction measures.
分析了沉井基础施工中虚假中心的形式、形成原因及危害,阐述了在施工过程中需注意的事项及预防与纠正措施。
4) sunk well foundation
沉井基础
1.
This paper analysed stability and structural calculation of sunk well foundation and its application in the discharging sluice of Shuang Yanghe river.
以黑龙江省双阳河泄洪闸为例,进一步分析了沉井基础的稳定与结构计算。
5) open caisson foundation
沉井基础
1.
Corresponding methods and techniques should be used to facilitate lowering the caisson foundation to the designed altitude in special geological conditions, because it may meet all kinds of geological conditions in the course of lowering the open caisson foundation.
桥梁沉井基础在下沉的过程中,会遇到各种不同的地质条件,在特殊地质条件下如使沉井能顺利地下沉到设计标高,需要采取相应的方法和措施。
2.
The design of the open caisson foundation for a railway bridge across the Yellow River is introduced.
黄河某特大二线铁路桥与既有桥沉井基础净距仅 16 。
补充资料:采用可拆卸预应力锚杆技术进行高层建筑基坑护坡
采用可拆卸预应力锚杆技术进行高层建筑基坑护坡
霹 采用可拆卸预应力锚杆技术进行高层建筑基坑护坡
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条