说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 沉井基础
1.
The Research of Interaction between Large Sunk Well Foundation and Foundation Soil;
大型沉井基础与地基土共同作用研究
2.
Research on Construction Method of Bridge Caisson Foundation under Special Geologic Condition;
特殊地质条件下桥梁沉井基础施工方法的研究
3.
Self-Balanced Load Test Study of Vertical Bearing Capacity of Root Type Caisson Foundation
根式沉井基础竖向承载力自平衡试验研究
4.
Key Techniques for Construction of North Anchorage Caisson Foundation of the Fourth Nanjing Changjiang River Bridge
南京长江第四大桥北锚碇沉井基础施工关键技术
5.
Construction Monitoring Techniques for North Anchorage Caisson Foundation of the Fourth Nanjing Changjiang River Bridge
南京长江第四大桥北锚碇沉井基础施工监控技术
6.
The Designing of Observing Zhangbei s Chief Mine s Headframe s Base s Subsidence and Deformation;
张北主井井架基础沉降及变形观测设计
7.
Study on the Subsidence Monitoring of Main and Auxiliary Shaft Headframe Foundations of WOLONG LAKE Coal Mine
卧龙湖煤矿主副井井架基础沉降监测研究
8.
Application of the Technique of Immersed Well Construction to the Deep Foundation of the Beach;
沉井施工技术在海滩深基础中的应用
9.
Foundation of T-type Open Caisson and Design of Sinking Stability Construction
T形沉井的基础及下沉稳定性施工设计
10.
Resistance Monitoring in Construction of Caisson Foundation of Cofferdam of Xiangjiaba Hydropower Station
向家坝水电站围堰基础沉井施工下沉阻力监测
11.
Heavy equipments of the construction technology of the open caisson method in the abnormal box foundation
重型设备异形箱体基础沉井法施工技术
12.
On the design and construction of the sunk well and cofferdam base in the over-sized Bridge on Songhuajiang
沉井围堰基础在松花江特大桥上的设计与施工
13.
Research into the Settlement Observation of Buildings Nearby under Pile Driving and Foundation Well-points Dewatering;
基础打桩和基坑井点降水情况下周边建筑物沉降观测方法的研究
14.
The Approaches for the Construction of Super Large Open Caisson Foundation of the North Anchorage on the Yangtze River Highway Bridge at Jiangyin
江阴长江公路大桥北锚碇基础特大沉井施工方法
15.
Analysis on the Mechanism of the Crack and Subsidence Occurred in the Foundation of the Engine Room for the Xifeng Shaft in Wushan Copper Mine
武山铜矿西风井机房基础发生裂缝和沉降的机制分析
16.
pplication of Caisson method Construction Technology to the Special-shaped box basis of Heavy Equipment
沉井法施工技术在重型设备异形箱体基础中的应用
17.
Study on the Mechanism of Joint Load-bearing of Various Sections in a Mine Shaft Tower System;
井塔—桩筏基础—地基—井壁的共同作用机理研究
18.
Consolidation Settlement of Sand Drain Subgrade Based on Biot Theory
基于Biot理论的沙井地基固结沉降分析