说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 地下输水隧洞
1)  lock culvert
地下输水隧洞
2)  underground drainage tunnel
地下排水隧洞
1.
Compared with the data of the groundwater level monitored by artificial and automatic measures before and after the implementation of underground drainage works,it is shown that the slope groundwater level has declined after excavating the underground drainage tunnel in crushed-rock slope.
对比实施地下排水工程措施前后滑坡体的地下水位监测结果,表明破碎岩质边坡中采用地下排水隧洞,可使坡体中的地下水位明显下降。
3)  underground tunnel
地下隧洞
1.
Three-dimensional numerical simulation and analysis of excavation and support in underground tunnel;
地下隧洞开挖和支护的三维数值分析计算
2.
Comparison of models for heat exchange calculation inside underground tunnel of hydra-power plant
水电站地下隧洞换热计算模型比较
3.
From the analysis of Shawan underground tunnel model,we take the cross section of IV surrounding rock as an example to calculate the displacement and stress of surrounding rock,lining and the stress of anchor bolts,then to research the influences of various excavation types of the tunnel surrounding rock s stability.
通过对沙湾地下隧洞工程的数学仿真模型的分析,以Ⅳ类围岩典型断面为例,计算围岩位移、围岩应力、衬砌及锚杆应力等,分析不同开挖方式对隧洞围岩稳定性的影响,探讨优选隧洞的支护及开挖方式,验证设计方案的合理性。
4)  water diversion tunnel
输水隧洞
1.
Three-dimensional simulation analysis of structure of deep water diversion tunnel with TBM constructing;
深埋TBM施工输水隧洞结构的三维仿真分析
2.
Two water diversion tunnels are embedded in soft soil under road.
使用基于弹塑性增量理论的三维有限元方法,较细致地模拟了公路下输水隧洞近接沉箱桩施工的过程,并考虑了混凝土和注浆地层力学参数随龄期的变化,得出了一系列对设计和施工具有重要参考意义的结论。
3.
Construction of vertical shaft by means of freezing is a new attempt for water diversion tunnel construction.
冻结法竖井施工是水工隧洞施工竖井施工的一种尝试,本文通过冻结法对竖井冻结后施工过程和工艺的介绍及在神木县供水工程输水隧洞项目中的运用成功,可对以后利用冻结法解决复杂地质施工问题和冻结状态下竖井施工有所借鉴和帮助。
5)  transporting water tunnel
输水隧洞
1.
Analysis and evaluation of stability of transporting water tunnel influenced by expressway;
高速公路对输水隧洞稳定性影响的分析与评价
2.
108 transporting water tunnels of Guanzhuang Reservoir,the reasons of the hidden safety trouble of the tunnel and some treatment measures are proposed.
醴陵市官庄水库92号、105号和108号的输水隧洞,在长期的运行中隧洞衬砌混凝土出现了裂缝、渗漏和蜂窝麻面,目前隧洞仍处于带病工作状态,存在较大安全隐患。
6)  water conveyance tunnel
输水隧洞
1.
Treatment on collapse of water conveyance tunnel of Maliba Reservoir in Yunnan Province;
云南麻栗坝水库输水隧洞坍塌处理
2.
Construction features of a super long water conveyance tunnel project with large cross section in construction;
大断面超长输水隧洞的施工特点
补充资料:地下水水资源评价(见水资源评价)


地下水水资源评价(见水资源评价)


  d ixiashui shuiziyuan Ping】ia地下水水资源评价见水资源评价。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条