1) air cooled closed chamber
水冷试验台
1.
Analyses the difference between the test results of water cooled and air cooled closed chamber of radiators, conforming to the international standard.
对国际标准规定的水冷式和风冷式散热器试验台的试验结果进行了对比分析 ,认为散热器试验台加保温板将使散热器散热量略有下降 ,但散热量相差不超过 2 %;水冷试验台的测试结果略低于风冷试验台的测试结果 ,散热量相差最大为 3%。
2) water cooled closed chamber
风冷试验台
1.
The tests show that with an insulating panel heat emission from water cooled closed chamber will slightly decrease, the difference of heat emission being not more than 2%; and that the radiator test results of water cooled closed chamber are lower than that of air cooled closed chamber, the maximum difference of heat emission is 3%.
对国际标准规定的水冷式和风冷式散热器试验台的试验结果进行了对比分析 ,认为散热器试验台加保温板将使散热器散热量略有下降 ,但散热量相差不超过 2 %;水冷试验台的测试结果略低于风冷试验台的测试结果 ,散热量相差最大为 3%。
3) cold water test
冷水试验
1.
Methods Hand thermograph was carried out using KY-333 Infrared Photography before and after cold water tests in 50 grinders who were exposed to hand-arm vibration(vibration group)and another 50 workers not exposed to vibration as control.
[目的]利用红外摄像结合冷水试验了解手臂振动对手部周围循环功能的影响。
4) water-cooled test bed
水冷实验台
5) pump test-bed
水泵试验台
1.
Realization of the electric valve′s PI control in pump test-bed based on PLC;
基于PLC的水泵试验台电动阀门PI控制的实现
6) resistance-load test bed
水阻试验台
1.
Aiming at the advantages and disadvantages of the traditional resistance-load test, this text proposes to apply computer technology in resistance-load test bed which can realize automatization and digitization and can save the time of testing and improve working efficiency.
第二章介绍了价值工程的基本原理以及水阻试验的主要任务,水阻试验台微机化技术改造整个过程以价值工程的一般工作程序。
补充资料:K9225水压试验台操作规程
1、遵守铸设备通用操作规程。
2、检查所有的密封堵塞件是否完好,如有损坏,应于更换。
3、逐个操纵各伐门手柄进行试车,检查管路系统是否有漏气漏水现象,确认一切正常后,方可进行生产。
4、在吊运缸体过程中,不要碰撞设备,注意人身安全。
5、工作以后,缸体要吊离设备,不要停放在试验台上。
2、检查所有的密封堵塞件是否完好,如有损坏,应于更换。
3、逐个操纵各伐门手柄进行试车,检查管路系统是否有漏气漏水现象,确认一切正常后,方可进行生产。
4、在吊运缸体过程中,不要碰撞设备,注意人身安全。
5、工作以后,缸体要吊离设备,不要停放在试验台上。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条