说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 水泵试验台
1.
Application and Research of Calibrating Facility for the Flowmeter of Pump Test Rig;
水泵试验台流量原位标定系统研究与实践
2.
Research on the Test & Control System Based on Pump Water-Seal Workbench;
泵用水封试验台测试控制系统的研制
3.
AN EXPERIMENTAL STUDY OF AN OPEN PUMP SUMP WITH BACKWARD-FACING STEP FLOW
水泵吸水池后台阶内部流场试验研究
4.
Research on Measurement and Control System of the Multifunction Pump Test-Bed;
多功能水泵综合试验台测控系统研究
5.
Development of multi-function experimental platform for pump and devices model
多功能水泵模型及装置模型试验台的开发
6.
Method for testing fuel injection pump test-stand
GB/T14096-1993喷油泵试验台试验方法
7.
Testing methods of water-turbine pump
GB/T6490.2-1986水轮泵试验方法
8.
The components testing lab can conduct test on fuel pump, exhaust system, air blower, water pump, oil pump, and different kinds of electrical appliances, etc.
零部件试验室可以进行油泵、气道、气泵、水泵、机油泵、电器等多种试验。
9.
Calibrating rule of using fuel injection pump test-bench
GB/T17368-1998在用喷油泵试验台的校验
10.
Research of Single Chip Computer Controlling the Electronic-Controlled Fuel Injection Pump Test Stand;
单片机控制电子喷油泵试验台的研究
11.
DESIGN OF AIR SOURCE HEAT PUMP WATER HEATER PERFORMANCE’S TEST-ROOM
空气源热泵热水机性能测试台的研制
12.
Field acceptance test method for hydraulic performances of water turbines and pump-turbines
水轮机/水泵水轮机水力性能现场验收试验方法
13.
The Model Experiment of Sand Prevention of Langdian Pumping Station in Yellow River
黄河浪店泵站取水防沙水工模型试验
14.
Model Acceptance Test of the Baoying Pumping Station in the South-to-North Water Project
南水北调东线一期工程宝应泵站水泵装置模型验收试验成果分析
15.
The Acceptance Test of the Model Pump Systerm of Linjiaba Pumping Station in the Eastern Route First-stage Project of the South-to-North Water Transfer Project
南水北调东线一期工程蔺家坝泵站水泵模型装置验收试验
16.
Study on Pump System Experiment and the Numerical Simulation of Flow in the Inlet;
泵装置试验与进水流道数值模拟研究
17.
Hydraulic Design and Experimental Study on Self-priming Performance of Self-priming Pump;
自吸泵水力设计与自吸性能试验研究
18.
Design and Experimental Study of Water Hydraulic External Gear Pump;
水压外啮合齿轮泵的设计与试验研究