说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 非溢流坝段
1)  non-overflow section of dam
非溢流坝段
2)  overflow dam section
溢流坝段
1.
According to the actual engineering conditions of overflow dam section,the 3-D FEM model of the overflow dam section has been built by using general program ANSYS.
基于马堵山重力坝溢流坝段的工程地质条件建立了坝体和坝基的三维有限元模型,计算了不同工况下的应力和变形,得出了坝体的位移场和应力场,并计算了校核工况下坝基面的抗滑稳定安全系数及正常蓄水工况下坝段的安全系数。
3)  non-overflow dam
非溢流坝
4)  spillway bucket
溢流坝反弧段
1.
Measurements of longitudinal velocity and its fluctuation intensity in seven sections of a spillway bucket were conducted with a one-component laser anemomenter system, which showed that in the bucket part of the model spillweir dam,there exists a weak 3-D flow.
本文利用一维激光测速系统,在实验室模型上,对光滑溢流坝反弧段边界层水流特性进行了试验研究。
5)  non-flow gravity dam
非溢流重力坝
1.
A draft of fundamental profile of non-flow gravity dam;
非溢流重力坝基本剖面的拟定
6)  overflow dam section overhanging crest
溢流坝段悬挑部位
补充资料:非溢流重力坝


非溢流重力坝
non-overflow gravity dam

  feiyiliu zhongliba非溢流重力坝(non一overflow gravitydam)坝顶不溢流的重力坝。各种型式的重力坝都可以建为非溢流坝。筑坝材料多用混凝土,中小型工程也可用浆砌块石。 在大多数重力坝枢纽中,于河床中部或主流部分布置溢流重力坝,两侧布置非溢流重力坝与岸坡相接,其间用边墩和导墙隔开(见重力坝图2)。少数工程,如中国刘家峡水电站,由于河谷狭窄,需布置电站厂房,岸边又有适宜条件布置溢洪道,经方案比较,设置了河岸式溢洪道,拦河坝全部为非溢流重力坝。非溢流重力坝可根据调洪预泄、放空水库、排沙等运用要求在坝身布置深式泄水孔。当有坝后厂房时,可穿过坝体布置发电引水管。 非溢流重力坝的坝体设有横缝、纵缝、止水、排水、廊道等(见坝体分缝、止水、坝内排水管、坝内廊道)。进行非溢流重力坝剖面设计时,常先拟定基本剖面,再根据运用和施工要求修改成为实用剖面(见重力坝剖面),然后进行详细的稳定和强度计算(见重力坝应力分析和重力坝抗滑稳定),根据计算结果再进行修正。为减小计算工作量,各国已编制了不少重力坝剖面优化程序,可用电算求解。剖面确定后,再进行分缝、止水、排水、廊道、坝内引水管、深式泄水孔等的设计和计算。对坝基稳定和处理应给予足够重视(见大坝岩基处理)。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条