1) assemble and disassemble plan
装拆方案
1.
The author of this paper mainly introduces the drawing-up tower crane s assemble and disassemble plan,and some problems in the process of its installation,application and disassemble as well.
介绍了高层塔吊装拆方案的编制以及安装、使用、拆除过程中应注意的问题。
2) demolishing scheme
拆除方案
1.
Drawing up of the demolishing scheme of continuous double arch bridge and its on-site demolishing construction supervision;
双曲连拱桥拆除方案拟定及现场拆除施工监控
3) Program for Split
拆分方案
4) cable-removing scheme
拆扣方案
1.
In order to overcome the limitations of the method that hard to refine the internal force of the arch rib as well as possibly too large precambers,taking notice of the influence by the time,order and method of cable-removing before and after the closure to alignment and internal force of the rib,the modified cable-removing schemes are brought forward.
为克服这种方法难以调整主拱肋内力和预抬高量可能偏大的缺陷,并注意到合龙前后拆除扣索的时间、顺序和方法的差异会对拱肋的线形、内力产生影响,提出修正拆扣方案,将部分扣索调整到合龙之前拆除,并对几种可行方案进行了分析和优化比选,确定了一个最佳的,更利于施工控制的方案。
5) dismounting method
拆装方法
1.
This paper made a detailed description on the working principle of interference fit (no key) connection of conical surface and the calculating methods of its strength and stress, as well as the liquid pressure dismounting method.
文章详细介绍了圆锥面过盈(无键)联接的工作原理、强度、受力计算以及该联接的液压拆装方法。
6) Knock down method
装拆方法
补充资料:装聋装哑
1.见"装聋作哑"。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条