1.
A Study on Cable-Removing Scheme for Cable-Stay System of CFST Arch Bridge
某钢管混凝土拱桥斜拉扣挂系统拆扣方案研究
2.
Construction Scheme of Blast Engineering of a Flood Spillway Gate Urge
某溢洪道闸墩爆破拆除工程施工方案
3.
Finite Element Analysis for the Schema of the Train Wheel Equipped with Buckle
机车轮对加装扣环方案的有限元分析
4.
Remove valve spring and retainer.
拆卸阀弹簧和扣件。
5.
Pulley Snap Ring Remove/Install
皮带盘扣环拆卸/安装
6.
GENERAL BLASTING DESIGN FOR DEMOLITION OF EIGHT BUILDINGS IN WAITAN GARDEN
外滩花园8栋楼房爆破拆除总体方案设计
7.
The Rule of Urban Removal and the Key to Tartars;
论拆迁应遵循的法律原则及“钉子户”的解决方案
8.
Contrastive Study of Teaching Reform in the Practice of Dismantling and Reassembling Dynamic and Power Equipments;
动力设备拆装实践性教学改革方案比较研究
9.
On Demolition Scheme for an Old Bridge across Bachi River
浅谈南宁市五象大道八尺江旧桥拆除方案设计
10.
Scheme research of safe demolition of reinforced concrete truss arch bridge
钢筋混凝土桁架拱桥安全拆除的方案研究
11.
Structure and Temperature Field Analysis for the Scheme of the Train Wheel Equipped with Buckle
轮对加装扣环方案的结构及温度场分析
12.
The Mechanical Analysis of Train Wheel Pair Equipped with Coupling Collar;
机车轮对轮箍加装扣环方案的力学性能分析
13.
Design of Price Discount Projects in Supply Chain Enterprises;
供应链企业在各种关系下的价格折扣方案设计
14.
Combined with the surroundings of the reinforced concrete gate, a suitable blasting demolition program is selected, the effectiveness is satisfactory.
结合待拆钢筋混凝土大门的周围环境,选取了合适的爆破拆除方案,爆破效果较好。
15.
Remove the latch clip and disconnect the fuel supply hose.
拆卸锁闩扣夹并断开燃油供给软管。
16.
Separate striker and spacer from vehicle.
从车辆上拆下扣击板和垫片。
17.
Remove the push-in fastener from the top of the fan shrou
从风扇围板顶部拆下压入扣件。
18.
How to Remove the Problems in House Removal--the Enlightenment of a House Removing Case Which Caused a Great Sensation;
拆迁之局如何拆——一起轰动拆迁案例的启示