1) Fuzhou Huaneng Power Plant
福州华能电厂
1.
onstruction Experience of the 2nd- phase Coal Terminal Project of Fuzhou Huaneng Power Plant;
福州华能电厂二期煤码头施工经验
2) Huaneng Dezhou Power Plant
华能德州电厂
1.
The causes of slagging in two 2209 t/h boilers of the third-phase project for Huaneng Dezhou Power Plant have been analysed.
对华能德州电厂三期2台2209t/h锅炉结焦的原因进行了分析,认为其主要因水冷壁卫燃带布置过多,炉膛结构设计相对偏小所致。
3) Fuzhou Power Plant
福州电厂
1.
The integral design of combustion control system realized by adopting T - XP type distributed control system (DCS) from Siemens AG for 2 X 350 MW units in second - phase project of Huaneng Fuzhou Power Plant has been presented, and the control circuit with distinctive features in the design being analysed.
介绍了华能福州电厂二期2×350 MW机组采用西门子T—XP DCS实现燃烧控制的系统整体设计,并对设计中具有特色的控制回路进行了分析。
4) Zilong (Fuzhou) Electrical Equipment Factory
志荣福州电子设备厂
5) Guangzhou Pumped Storage Plant
广州蓄能水电厂
1.
The efficiency test of the electric generator of the Guangzhou Pumped Storage Plant (second stage) was conducted in the No.
广州蓄能水电厂 (二期 )电动发电机的效率试验在 7号机上进行 ,由西门子公司试验专家负责现场实施。
2.
In the design and implementation of observation system of horizontal displacement of the dam for the upper reservoir of Guangzhou Pumped Storage Plant, such observation methods and their a.
在广州蓄能水电厂上库坝水平位移观测系统设计实施过程中 ,对这两种前方交会法的观测方法及其精度进行了深入的比较 ,最终选择了测边前方交会法。
6) Guangzhou Pumped Storage Power Station
广州蓄能水电厂
1.
The International Benchmarking Program in Guangzhou Pumped Storage Power Station is introduced,including the benchmarking′ method,procedure and results,and the characteristics of benchmarking is analyzed.
广州蓄能水电厂为寻求不断改善生产经营业务流程和工作绩效而实施了国际对标工作,包括:对标内容、方法及实施过程、成果和特点;并结合国内电力系统标杆管理经验,提出了水电厂同业对标的探索性意见,可供同行参考。
2.
On the basis of the actual measurement and analysis of pressure pulse of the 300 MW pumped storage units for the Guangzhou Pumped storage Power Station (first stage), the author describes the arrangement of testing points, analysis methods and basic parameters.
通过对广州蓄能水电厂 (一期 ) 30 0MW抽水蓄能机组压力脉动的实测与分析 ,就测点布置、分析方法与基本参数作了说明 ,并对测点信号时域特征和频域特性进行了研究 ,给出了压力脉动沿流道的分布。
3.
The layout,configuration and relative function of the stability monitoring and tracking analyzing system for pump turbine units in Guangzhou Pumped storage Power Station are introduced in this paper.
介绍了广州蓄能水电厂水泵水轮机组稳定性状态监测及跟踪分析系统的布置、结构组成以及相关的功
补充资料:华能大连电厂
华能大连电厂
Huaneng Dalian Power Plant
华能大连电厂(Huaneng Dalian power pl-ant)中国第一家利用外资(占60%)和国内集资(占40%)建成的大型燃煤电厂〔见彩图插页第26页)o位于大连市大连湾镇。一期工程装机容量为2义35万kw。1986年8月动工,1988年底全部建成投产。首任厂长为日本人铃木。电厂在1989年试生产期间,于2月、5月先后发生两起重大事故,引起国内外关注。中方首任厂长金浪川接任(1 989·12一)以后,制订了以赶超国际一流电厂为目标的规划,加强管理,狠抓文明安全生产。从1990年以来,实现连续安全生产1129天(截至93年底);供电煤耗达到3229/kw·h;1990一1993年累计上缴13.72亿元;1993年全员劳动生产率达92.53万元/人·年(按1990年不变价格计算)。电厂的主要技术经济指标均达到国际一流电厂水平。据此,电力工业部于1994年6月28日授予华能大连电厂“一流火力发电厂”称号。这是中国第一家达到此标准的大型火力发电厂,也是截至1994年底唯一获此荣誉的电厂。 华能大连电厂在管理上的特点是:①在运行机制上改变中国电厂中传统的机、炉、电分散控制为集中控制,使每值由25人减至14人;②建立了生产、安全、设备维护、财务和人事管理5个计算机网络管理系统,实现计算机决策管理;③改变检修工作“小而全”的体制,把检修工作分为“策划”和“作业”。前者主司管理,后者承担设备维护与定检;④按照“精简、统一、效能”的原则,精简管理层次和人员,促进了管理从生产型转向生产经营型;⑤把检修、燃料、运输等各辅助车间从电厂分离出去,成立关联公司,实行独立核算,服务电厂。由于实施了现代化管理,电厂人员由687人减至280人,达到国外相同电厂的先进水平。 (张友韬)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条