您的位置:首页 -> 词典 -> 广州抽水蓄能水电厂
1)  Guangzhou Pumped storage Power Plant
广州抽水蓄能水电厂
2)  Guangzhou Pumped Storage Plant
广州蓄能水电厂
1.
The efficiency test of the electric generator of the Guangzhou Pumped Storage Plant (second stage) was conducted in the No.
广州蓄能水电厂 (二期 )电动发电机的效率试验在 7号机上进行 ,由西门子公司试验专家负责现场实施。
2.
In the design and implementation of observation system of horizontal displacement of the dam for the upper reservoir of Guangzhou Pumped Storage Plant, such observation methods and their a.
在广州蓄能水电厂上库坝水平位移观测系统设计实施过程中 ,对这两种前方交会法的观测方法及其精度进行了深入的比较 ,最终选择了测边前方交会法。
3)  Guangzhou Pumped Storage Power Station
广州蓄能水电厂
1.
The International Benchmarking Program in Guangzhou Pumped Storage Power Station is introduced,including the benchmarking′ method,procedure and results,and the characteristics of benchmarking is analyzed.
广州蓄能水电厂为寻求不断改善生产经营业务流程和工作绩效而实施了国际对标工作,包括:对标内容、方法及实施过程、成果和特点;并结合国内电力系统标杆管理经验,提出了水电厂同业对标的探索性意见,可供同行参考。
2.
On the basis of the actual measurement and analysis of pressure pulse of the 300 MW pumped storage units for the Guangzhou Pumped storage Power Station (first stage), the author describes the arrangement of testing points, analysis methods and basic parameters.
通过对广州蓄能水电厂 (一期 ) 30 0MW抽水蓄能机组压力脉动的实测与分析 ,就测点布置、分析方法与基本参数作了说明 ,并对测点信号时域特征和频域特性进行了研究 ,给出了压力脉动沿流道的分布。
3.
The layout,configuration and relative function of the stability monitoring and tracking analyzing system for pump turbine units in Guangzhou Pumped storage Power Station are introduced in this paper.
介绍了广州蓄能水电厂水泵水轮机组稳定性状态监测及跟踪分析系统的布置、结构组成以及相关的功
4)  Guangzhou Pumped-storage Power Plant
广州抽水蓄能电站
1.
Economic Dispatching Strategies and its Operating Experience of Guangzhou Pumped-storage Power Plant;
广州抽水蓄能电站机组经济调度及运用经验
2.
Fundtions or Guangzhou Pumped-storage Power Plant in Guangdong Power Network and its Economic Analysis;
广州抽水蓄能电站在广东电网中的作用及经济性分析
5)  Guangzhou Pumped Storage Station
广州抽水蓄能电站
1.
Analysis on Dam s Displacement of Guangzhou Pumped Storage Station;
广州抽水蓄能电站大坝位移监测成果分析
2.
This paper presents the arrangement of drainage system for high pressure tunnels, high pressure bifurcations and high pressure diversion penstocks of stage I Project of Guangzhou Pumped Storage Station and the results after filling test.
本文介绍广州抽水蓄能电站一期工程高压隧洞、高压岔管及高压引水钢支管的排水系统布置及其充水试验后的效果。
6)  Guangzhou Pumped Storage Plant
广州抽水蓄能电站
1.
On the basis of using the successful experience of the first-stage project for reference and the actual measurement data, the second-stage project of the Guangzhou Pumped Storage Plant adopts the principles and methods of pervious lining tunnel to conduct the structural design of high-pressure tunnel for the second-stage project.
广州抽水蓄能电站二期工程 ,在充分借鉴一期工程的成功经验和实测资料的基础上 ,采用透水衬砌隧洞的原理和方法 ,对二期工程高压隧洞进行结构设计。
2.
The whole project of the Guangzhou Pumped Storage Plant with the installed capacity of 2400 MW was completed and put into operation in March 2000, which is the largest pumped storage station in installed capacity in the world at present.
装机容量为 2 4 0万kW的广州抽水蓄能电站已于 2 0 0 0年 3月全部建成投产 ,它是当今世界上装机规模最大的抽水蓄能电站。
补充资料:广州抽水蓄能电站
广州抽水蓄能电站

    中国第一座大型抽水蓄能电站。位于广东省从化市黄竹。原为广东省第一座中型水电站,建于1958年8月,总装机容量4.2万千瓦。为配合深圳大亚湾核电站的建设,决定将其改建为抽水蓄能电站,以总库容3.26亿立方米的流溪河水库为调节水库,电站新装机容量120万千瓦,利用大亚湾核电站夜间多余的电力抽水蓄能,白天发电。电站主体工程1990年8月开工,1994年完成。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。