说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 工作竖井
1)  working shaft
工作竖井
1.
Three dimensional model of space crossing structure by which working shaft is connected with tunnel shield and open cut tunnel is established.
建立工作竖井与盾构隧道、明挖隧道相连的空间交叉结构三维模型,采用FLAC3D对该复杂结构进行了纵向地震响应分析,得到了工作竖井与隧道结构连接处关键点的位移和应力响应规律。
2)  ultra-deep working shaft
超深工作竖井
1.
Furthermore,a series of technical pblems,such as the ultra-deep working shaft,seismic design of underground structure in soft soil,safety monitoring in long tunnel and long-distance information transmission,long distance construction by shield tunneling under bottom pressure and so on,were solved.
通过工程总体布置优化和多项专题研究,包括按1:1比尺建立埋深30余m的隧洞仿真试验模型,较真实地模拟外部水土环境和内水压力的试验研究,提出了盾构隧洞新型预应力双层衬砌结构型式,还解决了超深工作竖井,软土地下建筑物抗震,长隧洞安全监测与长距离信息传输,水底压力隧洞盾构法长距离施工等一系列技术难题,确保工程顺利进行,实现科技创新。
3)  shaft operation
竖井作业
4)  Shaft construction
竖井施工
1.
According to the construction experiences of Eastern part skip Shaft construction technique of dahongshan copper mine,introduced the quickly construction technique of thousand meters shaft,analyzed and valued the construction methods,machines collocation,personal organization and construction organization.
根据大红山铜矿东部箕斗竖井工程施工经验,介绍了千米竖井快速施工技术,对竖井施工方法、机械设备配置、人员组织安排及施工组织进行分析和评价。
5)  shaft engineering
竖井工程
6)  construction silo
施工竖井
1.
This article introduced that our company put up project optimization of construction silo of Guangzhou third underground railway according to request of inviting public bidding document, and combining characteristic and advantage of construction in coal industry, accumulated experience for our company underground railway bidding.
介绍了中煤第一建设公司在广州地铁工程投标中,按照招标文件要求,结合煤炭行业竖井井筒施工特点和优势,对两个标段三个施工竖井的施工方案进行的优化对比,为该公司进行地铁工程投标积累了经验。
补充资料:弹塑性岩体内竖井地压理论


弹塑性岩体内竖井地压理论
ground pressure around shaft in elastic-plastic rock

tonsux一ng yant一ne一shuJ一ngd一yol一}un弹塑性岩体内竖井地压理论(ground pres-sure around shaft in elastie一plastie roek)在表土或软岩中掘进竖井时,若岩体只产生弹性变形,岩体是稳定的,不必计算地压。只有在产生塑性及流变变形时,才需要计算地压;竖井各水平截面上地压不等。按轴对称条件求出竖井周边位移,再求出支护位移公式,将它们联立求解,即可得到竖井地压。也可用图解法找到两条位移与应力关系曲线的交点,该点的纵坐标值即为竖井地压(见图)竖井围岩周边位移公式为: “止 U 竖井变形地压计算图 1围岩位移曲线;z支护特性曲线 a(p。s、n,,+。eos叭)厂(尸。+。.eot,t川一sin,.门导 ZG,匕P。+cicot笋,J式中“。为竖井围岩周边位移,m;a为竖井掘进半径,m;P0为原岩水平应力,重力场条件下,P0一六yI1,MPa;c,为第i层岩石粘结力,MPa;尸b为支护抗力,等于围岩作用在支护结构上的径向压力,但作用方向相反,MPa;笋,为第i层岩石内摩擦角;G.为第!层岩石剪切弹性模量;MPa。 竖井筒形支护特性方程为: l一群2厂bZ+a,尸1。, z,‘一二六舟}头‘-共一一IP,b EL右2一aZx一尸J“”式中u。为支护外半径表面的径向位移,支护与围岩密贴的情况下,“,一“、;E及产分别为支护材料的弹性模量及泊桑比;“为支护内半径,m;b为支护外半径,m;尸二为竖井变形地压,尸。一尸b,MPa。 (高磊)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条