1) large-scale surge tank project
大型竖井工程
1.
Engineering practices show that lining hanging concrete in time is an important technique to make sure of the construction safety of large-scale surge tank project at complex geologic condition.
工程实践表明,跟进衬砌悬挂混凝土是保证复杂地质条件下大型竖井工程施工安全的重要技术措施。
3) Shaft construction
竖井施工
1.
According to the construction experiences of Eastern part skip Shaft construction technique of dahongshan copper mine,introduced the quickly construction technique of thousand meters shaft,analyzed and valued the construction methods,machines collocation,personal organization and construction organization.
根据大红山铜矿东部箕斗竖井工程施工经验,介绍了千米竖井快速施工技术,对竖井施工方法、机械设备配置、人员组织安排及施工组织进行分析和评价。
4) working shaft
工作竖井
1.
Three dimensional model of space crossing structure by which working shaft is connected with tunnel shield and open cut tunnel is established.
建立工作竖井与盾构隧道、明挖隧道相连的空间交叉结构三维模型,采用FLAC3D对该复杂结构进行了纵向地震响应分析,得到了工作竖井与隧道结构连接处关键点的位移和应力响应规律。
5) construction silo
施工竖井
1.
This article introduced that our company put up project optimization of construction silo of Guangzhou third underground railway according to request of inviting public bidding document, and combining characteristic and advantage of construction in coal industry, accumulated experience for our company underground railway bidding.
介绍了中煤第一建设公司在广州地铁工程投标中,按照招标文件要求,结合煤炭行业竖井井筒施工特点和优势,对两个标段三个施工竖井的施工方案进行的优化对比,为该公司进行地铁工程投标积累了经验。
6) utility shaft
工程设施网用竖井
补充资料:鞍山钢铁(集团)公司大型轧钢厂大型轧机热轧型钢
鞍山钢铁(集团)公司大型轧钢厂大型轧机热轧型钢
鞍山钢铁(集团)公司大型轧钢厂大型轧机热轧型钢
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条