说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 黑河水利枢纽工程
1)  Heihe water conservancy key project
黑河水利枢纽工程
2)  Heihe Hydro Project
黑河水利枢纽
1.
<Abstrcat> The river retaining dam in Heihe Hydro Project, being 130 m in height, is a sandy gravel dam with the clay core wall.
黑河水利枢纽的拦河大坝为粘土心墙砂砾石坝,坝高130m。
3)  Yellow River Longkou Water Conservancy Project
黄河龙口水利枢纽工程
1.
Yellow River Longkou Water Conservancy Project Gravel System High Slope Presplit Blasting Test and Application;
黄河龙口水利枢纽工程砂石系统高边坡预裂爆破试验及应用
4)  water project
水利枢纽工程
1.
In order to estimate the impacts of water projects on ecological ca- pacity,the method by which resource output was regarded as the supply of ecological capacity was adopted based on analyzing the disadvantage of this model.
为评价水利枢纽工程对生态承载力的影响,在分析该模型缺点的基础上,采用了资源产出作为生态承载力供给的计算方法。
5)  the key water projects at the Three Gorges on the Yangtze River and at Xiaolangdi on the Yellow River
长江三峡和黄河小浪底水利枢纽工程
6)  Shanxi Water Conservancy Project
珊溪水利枢纽工程
1.
Disasters Loss Reducing of Shanxi Water Conservancy Project;
珊溪水利枢纽工程防洪减灾效益实证研究
2.
Analysis on Shanxi Water Conservancy Project in Wenzhou Social and Economic Development
珊溪水利枢纽工程对温州社会经济发展的作用分析
3.
As the large water tank of Wenzhou people, the water quality of Shanxi Water Conservancy Project has taken on a downward trend, by the pollution of agriculture and dome.
温州珊溪水利枢纽工程作为温州人民的“大水缸”,近年来由于受水源地农业、生活等方面污染源的影响,珊溪水利枢纽水源水质呈下降趋势,如果不加以适当保护,极有可能不能满足地表水饮用水标准。
补充资料:葛洲坝水利枢纽二期工程的工地


葛洲坝水利枢纽二期工程的工地


葛洲坝水利枢纽二期工程的工地
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条