1) Zipingpu water conservancy project
紫坪铺水利枢纽工程
1.
Zipingpu water conservancy project is located at upriver of Minjiang, and the excavated slope is about 300m high with soft rock widely distributing in the bed rock.
岷江紫坪铺水利枢纽工程修建于含软岩的地层环境中,工程开挖边坡高达300m±。
2) Zipingpu Hydro Project
紫坪铺水利枢纽
1.
Implementation and analysis on emergency monitoring of Zipingpu hydro project after Wenchuan earthquake;
汶川特大地震中紫坪铺水利枢纽工程应急监测的实施和分析
2.
Based on the features of the deformation and slide of the diversion tunnel overburden slopes in Zipingpu Hydro Project,the monitored points of surface displacement were established to monitor the deformation area in time.
针对紫坪铺水利枢纽工程导流洞覆盖层边坡变形和滑动的特点,及时地建立了地表位移监测点,对变形区进行监控。
3) Zipingpu hydraulic projectt
紫坪铺水利工程
4) Zipingpu hydroproject
紫萍铺水利枢纽
5) water project
水利枢纽工程
1.
In order to estimate the impacts of water projects on ecological ca- pacity,the method by which resource output was regarded as the supply of ecological capacity was adopted based on analyzing the disadvantage of this model.
为评价水利枢纽工程对生态承载力的影响,在分析该模型缺点的基础上,采用了资源产出作为生态承载力供给的计算方法。
6) Zipingpu Project
紫坪铺工程
1.
Distribution of Abandoned and Old Coal Mines in the Dam Area at Zipingpu Project;
紫坪铺工程坝区废旧煤洞的分布特征
2.
Due to complex and varied geological conditions for 4 headrace tunnels at Zipingpu Project , real time monitoring technique was used during informatization construction according to new Austrian tunneling method , system observation for typical sections was conducted by following in situ construction , based on which inverse analysis for rock mechanics parame.
针对紫坪铺工程 4条引水发电隧洞复杂多变的地质条件 ,采用新奥法隧洞信息化施工中倡导的实时动态监测技术 ,跟踪现场施工进行了典型断面的系统观测 ,在此基础上进行了围岩宏观力学参数的反分析研究。
补充资料:葛洲坝水利枢纽二期工程的工地
葛洲坝水利枢纽二期工程的工地
葛洲坝水利枢纽二期工程的工地
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条