1.
A retaining cofferdam is built at tail water outlet of Longtan hydropower station by heightening on preserved rock ridge in dry season.
龙滩水电站尾水出口工程枯水期施工围堰采用在预留岩坎上加高形成挡水围堰方式,根据工程特点,介绍围堰布置形式,设计标准,参数选择等,结合施工过程中的实际情况,提出土石子围堰闭气和浆砌石主围堰堰体防渗中应注意的几个问题。
2.
In consideration of actual construction,the parameters determination and computation for design the cofferdam at tail water outlet of Longtan was introduced,and the problems,which should pay attention to,were pointed out.
介绍龙滩水电站尾水出口工程枯期围堰的设计参数及计算过程,结合施工过程中的实际情况,总结得出土石子围堰的闭气方法和浆砌石主围堰堰体防渗的应注意几个问题。
3) drain hydropower station
尾水电站
1.
Optimum mathematic models and their solutions are obtained in the article about circulating water system of thermal power plant with drain hydropower station.
以火电厂带尾水电站的循环水系统为对象,建立了优化运行的数学模型,提出了求解算法,并针对某厂300MW机组,通过计算得到了不同负荷下系统的最优运行方式。
4) draft tube port
尾水管出口
6) Shuikou hydropower station
水口电站
1.
No.19 dam block of Shuikou hydropower station;
水口电站19号坝段观测数据处理方法