1) high-pressure tunnel
高压隧洞
1.
Design of high-pressure tunnel of the Guangzhou Pumped Storage Plant (second stage);
广蓄二期工程高压隧洞设计
2.
Observed data analysis of water filling test of the high-pressure tunnel in Tianhuangping Pumped-Storage Power Station
天荒坪抽水蓄能电站高压隧洞充水试验实测资料分析
2) high pressure conveying water tunnel
高压输水隧洞
1.
But according to the results of hydraulic fracturing test and the minimum principal stress criterion,the steel liners of the high pressure conveying water tunnel and even at the branch section are all cancelled,and just supported by reinforced concrete liner with thickness of 60 cm.
在高压输水隧洞及地下厂房围岩中,遇水膨胀的蚀变岩带十分发育。
3) high pressure water carriage tunnel
高压引水隧洞
1.
On the basis of concrete lining deformation character with crack emerged, a design method of high pressure water carriage tunnel lining is put up.
在借助渗流体积力考虑渗流场的力学效应,并由室内试验获得渗透系数随应力水平而变化的关系式的基础上,建立了裂缝混凝土衬砌和渗水围岩地层中渗流场与应力场的耦合计算模型,然后根据衬砌混凝土裂缝出现和开展后的受力变形的特征,提出了一种可供高压引水隧洞衬砌配筋采用的计算方法,并将其应用于广蓄电站二期工程高压引水隧洞衬砌的设计研究。
4) high pressure tunnel
水工高压隧洞
5) pressure tunnel
压力隧洞
1.
Study on computational method of crack width of reinforced concrete pressure tunnels;
钢筋混凝土压力隧洞裂缝宽度计算方法的探讨
2.
Post-tensioned prestress computation for lining concrete of pressure tunnel;
压力隧洞衬砌后张预应力计算
3.
Discussion of method of calculating crack width of permeable lining of pressure tunnel
压力隧洞透水衬砌裂缝宽度计算方法探讨
6) free-flow tunnel
无压隧洞
1.
Numerical simulation calculation of hydraulic transition process in free-flow tunnel;
无压隧洞水力过渡过程数值模拟研究
2.
The experimental research of energy dissipation in free-flow tunnel;
无压隧洞洞内消能试验研究
3.
Hydraulic transients on free-flow tunnel have to be a ticklish task in some connected cascade hydropower development.
水电站引水发电系统无压隧洞中的水力过渡过程是近年来电站设计中出现的一个新课题,特别是流域梯级电站开发中经常遇到。
补充资料:高压线走廊(高压架空线路走廊)
在计算导线最大风偏和安全距离情况下,35kV及以上高压架空电力线路两边导线向外侧延伸一定距离所形成的两条平行线之间的专用通道。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条