说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 底枢
1)  bottom pivot
底枢
1.
It introduces the stress adjustment of miter gate top pivot, stretch adjustment, lubrication between the axle and axle casing, lubrication at the contact part of bottom pivot mushroom head and the axle casing, stress adjustment of back rod, as well as some problems and suggestions in design.
介绍人字闸门顶枢拉杆的应力调整,伸出量调整及轴与轴套的润滑;底枢蘑菇头与轴套的接触部位及其润滑;背拉杆应力调整及其设计中的一些问题与建议。
2.
With the equipment simulating the bottom pivot at a proportion 1:10, we did some experiments to compare some metal-matrix materials with solid lubricant embedded to the materials used in the bottom pivot at present The results showed that materials with solid lubricant embedded had better properties in friction and wear behavior.
本文通过对人字门底枢工况进行1:10模拟的台架试验,分析比较了几种镶嵌型金属基复合材料:38CrMoAlA基镶嵌复合材料和大连三环公司的铜基镶嵌复合材料FZ5(3),为了便于比较把人字门底枢现行材料38CrMoAlA和QT500-7 也加入了试验。
2)  Gate bottom pivot
闸门底枢
3)  bottom gudgeon
底舵枢
4)  bilge pump stud
舱底泵枢键
5)  Xiaolangdi Hydro Project
小浪底水利枢纽
1.
Analysis of water environment during construction of Xiaolangdi Hydro Project for the reservoir region and lower reaches;
黄河小浪底水利枢纽工程建设期库区及下游水环境状况分析
2.
Measures for prevention of silt plug and abrasion in Xiaolangdi Hydro Project;
小浪底水利枢纽工程预防泥沙淤堵和磨蚀的工程措施
3.
Excavation of diversion tunnels and rock support measures in Xiaolangdi Hydro Project;
小浪底水利枢纽导流洞开挖与支护
6)  Xiaolangdi Water Control Project
小浪底水利枢纽
1.
Design on Water Stops of Working Gate for Desilting Tunnel of Xiaolangdi Water Control Project;
小浪底水利枢纽排沙洞工作闸门止水设计
2.
The technical and geological conditions of Xiaolangdi Water Control Project is very complicated.
小浪底水利枢纽技术和地质条件异常复杂,要确保工程如期截流,避免推迟截流所带来的经济损失及不良影响,设计、施工和监理等各方面必须想尽一切办法,加快施工进度。
补充资料:阿钵底钵喇底提舍那
【阿钵底钵喇底提舍那】
 (术语)A^patti-pratides/ana,忏悔之梵语,新译曰说非。寄归传二曰:“阿钵底者,罪过也。钵喇底提舍那,即对他说也,旧云忏悔。非关说罪。何者?忏摩乃是西音,自当忍义。悔乃东夏之字,追悔为目。悔之与忍回不相干。若的依梵本,诸除罪时,应云至心说罪。”饰宗记八本曰:“旧云忏悔。”
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条